Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02746
StatusFinaled
Name C H DEVELOPMENT
Site Address 1549 N CORMORANT PL
Project NameHolbrook Bldg (Shell)
Customer Number 
ePlanReviewNo
Description
Holbrook Building (Shell) - To build a new 15,500 square foot, one story, steel and wood framed retail and office shell building and related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. This is a shell building only and no occupancy is allowed under this permit. Separate tenant improvement permits are required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/27/20066/27/20066/27/2006PPASS
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled6/27/20066/27/20066/27/2006PPASS
DetailsMike Jordan
shell and core ok, special insp. ok per letter.
FIRE-Final Inspection6/26/20066/26/20066/27/2006PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final6/23/20066/23/20066/23/2006PNR
DetailsMike Jordan
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection6/23/20066/23/20066/23/2006PCANC
DetailsTroy Cobbley
Cancelled at the contractors request.
BLD-Framing/Rough-in4/24/20064/24/20064/24/2006PPART
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Reveiwed special inspection reports, noted that allwelding has been inspected. Received and reviewed letter from architect noting that partition wallls need only be one hour fire rating due to occupncy requirement, Also gave IBC table 720.1 item No. 15-1.16 and item 15-1.14 for 1hour construction.
BLD-Framing/Rough-in4/11/20064/11/20064/11/2006PPART
DetailsMike Jordan
Todd; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Exteroir steel stud walls and shear nailing. Needs to get special insp. on welding for steel studs.
BLD-Foundation2/2/20062/3/20062/3/2006APART
DetailsJim Sly
dick Note: around 11:00; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Sono tube sections above interior pads OK Pending special insp (Geotect) reviewing new Engineering, inspecting, testing and approvals.
BLD-Footing1/9/20061/10/20061/10/2006APASS
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Perimeter stemwalls. Soils work still required on interior portion of pad.
BLD-Footing1/4/20061/5/20061/5/2006APART
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. West and south stemwalls, north footing. wip.
BLD-Footing12/20/200512/20/200512/20/2005PPART
DetailsMike Jordan
as soon as possible//dick waltz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. concrete already placed when on site. rebar and conc insp by special inspector. ok
BLD-Footing12/12/200512/13/200512/13/2005APART
DetailsMike Jordan
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Contractor to get geo-tech report and have engineer inspect bottom og footing prior to building forms and reinforcement.