BLD-Final | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Mike Jordan
|
|
|
shell and core ok, special insp. ok per letter.
|
FIRE-Final Inspection | 6/26/2006 | 6/26/2006 | 6/27/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | NR |
Mike Jordan
|
|
|
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | CANC |
Troy Cobbley
|
|
|
Cancelled at the contractors request.
|
BLD-Framing/Rough-in | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Reveiwed special inspection reports, noted that allwelding has been inspected. Received and reviewed letter from architect noting that partition wallls need only be one hour fire rating due to occupncy requirement, Also gave IBC table 720.1 item No. 15-1.16 and item 15-1.14 for 1hour construction.
|
BLD-Framing/Rough-in | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PART |
Mike Jordan
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Exteroir steel stud walls and shear nailing. Needs to get special insp. on welding for steel studs.
|
BLD-Foundation | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | PART |
Jim Sly
|
|
|
dick Note: around 11:00; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Sono tube sections above interior pads OK Pending special insp (Geotect) reviewing new Engineering, inspecting, testing and approvals.
|
BLD-Footing | 1/9/2006 | 1/10/2006 | 1/10/2006 | A | PASS |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Perimeter stemwalls. Soils work still required on interior portion of pad.
|
BLD-Footing | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. West and south stemwalls, north footing. wip.
|
BLD-Footing | 12/20/2005 | 12/20/2005 | 12/20/2005 | P | PART |
Mike Jordan
|
|
|
as soon as possible//dick waltz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. concrete already placed when on site. rebar and conc insp by special inspector. ok
|
BLD-Footing | 12/12/2005 | 12/13/2005 | 12/13/2005 | A | PART |
Mike Jordan
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Contractor to get geo-tech report and have engineer inspect bottom og footing prior to building forms and reinforcement.
|