BLD-Final | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/9/2006 at 7:59:02 AM. Contact: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. I pointed out the maximum storage heights and other items to the general contractor. Warehouse was empty during inspection.
|
Permanent Occupancy | | 5/9/2006 | 5/9/2006 | | DONE |
|
|
|
|
BLD-Final | 5/4/2006 | 5/5/2006 | 5/5/2006 | P | PART |
Jim Sly
|
|
|
JIM nOTE: LATE AS POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Temp Occ. OK for Perm Occ when Fire Perms.
|
FIRE-Final Inspection | 5/5/2006 | 5/5/2006 | 5/5/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the signsat the entrances are installed monday
|
Code Occupancy Approval Temp | | | 5/4/2006 | | DONE |
|
|
|
posted bond for scope of work required by scott brown for $3,250/ 5/4/06/mls
|
Code Occupancy Approval Temp | 5/3/2006 | 5/3/2006 | 5/3/2006 | P | DONE |
Scott M.Brown
|
|
|
NEEDS TO BOND FOR PAINT $3250 THEN OK TO SIGN TEMPORARY OCCUPANCY
|
BLD-Conference | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | PASS |
Tom Arcoraci
|
|
|
|