Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02834
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 11801 W EXECUTIVE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(PICTURE GALLERIES) Minor interior remodel to a portion of the existing office area and a portion of the existing showroom area in an existing 52,850 sq. ft. building per approved plans. Work to include some miscellaneous interior demolition work, some new interior walls, relocating some interior doors, some interior finish, some suspended ceiling work, fire sprinkler work, mechanical work, and electrical work. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. This building was originally constructed in Ada County and later annexed into the City of Boise. NOTE: This building is fully fire sprinklered for area increase. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/5/20069/7/20069/7/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Aging Inspection9/4/20069/4/20069/5/2006 DONE
DetailsTroy Cobbley
Per Laten inspection will be called in for tomorrow
FIRE-Conference5/9/20065/9/20065/9/2006PDONE
DetailsTroy Cobbley
I contacted Laten about getting this permit finaled. He stated that he believed everything was done except for one door and that he would follow up on it.
FIRE-Final Inspection1/25/20061/25/20061/26/2006PFAIL
DetailsTroy Cobbley
Repair and test all exit signs and emergency lights. Provide emergency lighting in the corridor in front of the new "Interview Room 102" and in the main lobby. Remove manual flush bolts from the doors into "Interview Room 102" and into the lobby. They are not allowed per IFC 1008.1.8.4 Automatic flush bolts are allowed. Provide lever hardware or crashbar on the north office area exterior exit door.
BLD-Final1/23/20061/24/20061/24/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/23/2006 at 10:12:52 AM. Contact: ###-####. ok
BLD-Final1/19/20061/20/20061/20/2006PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/19/2006 at 2:34:51 PM. Contact: ###-####. Approved set of plans not available. Contractor to reschedule final.
BLD-Framing/Rough-in12/14/200512/14/200512/14/2005PPART
DetailsJim Storey
ceiling framing///layton anderson; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceilling ok pending mech permit and sign off from mec inspector.
BLD-Framing/Rough-in12/7/200512/8/200512/8/2005PPART
DetailsMike Jordan
laten Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. existing ceiling system is not floating, nedd to make new part of ceiling the same.
BLD-Framing/Rough-in11/21/200511/21/200511/21/2005PPART
DetailsMike Jordan
layton; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Selected interior walls only with no elec. in walls. ok to cover partition wall on one side only. plans on site not the approved set. notified contractor that approved set needs to be on site.