BLD-Final | 12/14/2005 | 12/14/2005 | 12/14/2005 | P | PASS |
Mike Jordan
|
|
|
hilary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. ok for perm occ.
|
FIRE-Final Inspection | 12/13/2005 | 12/14/2005 | 12/14/2005 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
BLD-Final | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PART |
Jim Sly
|
|
|
hillary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Hold downs appear OK. Fire on Temp. OK to (perm) Final when Fire Dept finals. Call Hillary and see if she needs C of C, or just final in computer.
|
FIRE-Final Inspection | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PART |
Forrest France
|
|
|
hilary - ###-#### A letter has been provided regarding the density available for the racking installation.
|
FIRE-Final Inspection | 11/29/2005 | 11/30/2005 | 12/1/2005 | A | CANC |
Forrest France
|
|
|
No time for inspection.
|
BLD-Final | 11/15/2005 | 11/17/2005 | 11/17/2005 | P | CANC |
Mike Jordan
|
|
|
hilary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. fire/life finaled failed.
|
FIRE-Final Inspection | 11/15/2005 | 11/17/2005 | 11/17/2005 | A | FAIL |
Troy Cobbley
|
|
|
hilary; Phone #: ###-#### Provide verification that the overhead sprinkler system is adequate for the racks and commodities installed per the fire dept racking review comments. Provide height limit signs for the maximum storage height.
|