BLD-Final | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Mike Jordan
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
DOC - Permit Finaled | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | PASS |
Mike Jordan
|
|
|
Handrail clearance issue has been resolved.
|
BLD-Final | 5/25/2006 | 5/26/2006 | 5/26/2006 | P | FAIL |
Mike Jordan
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. does not have the required 1.5 " clearance between handrail and wall.
|
BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Mike Jordan
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All framing issues have been resolved.
|
BLD-Energy code compliance | 2/24/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | FAIL |
Mike Jordan
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs header over bonus room door, needs 4x4 post for pointload under floor. c/n posted. ok to insul.
|
BLD-Footing | 1/4/2006 | 1/5/2006 | 1/5/2006 | P | PASS |
Mike Jordan
|
|
|
request around 3pm//ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|