BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 3:12:34 PM. Contact: ###-####.
|
Permanent Occupancy | | 6/28/2006 | 6/28/2006 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 6/28/2006 | | PASS |
|
|
|
|
FIRE-Final Inspection | 6/22/2006 | 6/23/2006 | 6/23/2006 | P | PASS |
Forrest France
|
|
|
All items on previous correction notice have been completed, inspection passed.
|
FIRE-Final Inspection | 6/16/2006 | 6/19/2006 | 6/20/2006 | A | FAIL |
Forrest France
|
|
|
Provide approved hardware at the west facing exit door, provide building address numbers for both sides of the building as it is corner facing, need to supply means to test the duct smoke detector.
|
BLD-Framing/Rough-in | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | PART |
Jim Storey
|
|
|
ceiling grid; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung pending others/ supply support/fire stop and patch restarm.
|
BLD-Framing/Rough-in | 5/10/2006 | 5/11/2006 | 5/11/2006 | A | PASS |
Jim Storey
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Other | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Jim Storey
|
|
|
chris - Note: roofing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 4/19/2006 | 4/19/2006 | 4/19/2006 | P | PASS |
Jim Storey
|
|
|
chris Note: roof; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Concrete | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Jim Storey
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong pwsi
|
BLD-Concrete | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PART |
Jim Storey
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pwsi
|
BLD-Concrete | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/6/2006 at 8:00:12 AM. Contact: ###-####. bond beam ok above winow front si on file.
|
BLD-Framing/Rough-in | 4/3/2006 | 4/3/2006 | 4/3/2006 | P | PART |
Jim Storey
|
|
|
Chris -- grout inspection; prefer 1PM; pouring concrete at 1PM; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | PART |
Tom Arcoraci
|
|
|
Chris -- masonry work; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong spec insp on site
|
BLD-Foundation | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Jim Storey
|
|
|
Chris -- for stem wall; prefers 3pm because concrete will show up; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | PASS |
Jim Storey
|
|
|
chris - ###-####
|