Permit Information
Permit NumberBLD05-02939
StatusFinaled
Name CHRISTENSEN CORP
Site Address 918 W BANNOCK ST
Project Name10TH & BANNOCK BLDG
Customer Number 
ePlanReviewNo
Description
(10TH & BANNOCK BUILDING - 10 STORIES) (7-20-06) THE DRAWINGS WERE REVISED TO SHOW VENTILATION DUCTS TO SERVE THE TEL/DATA CLOSETS ON THE 2ND STORY THROUGH THE 11TH STORY. IN ADDITION, DRAWINGS WERE PROVIDED SHOWING COOLING EQUIPMENT IN ROOM 112 ON THE 1ST STORY WHERE THE MAIN TELCOM SERVER RACKS WILL BE LOCATED. This structure is required to be fire sprinklered because it is a high-rise building. To install access floor systems and suspended ceiling systems on the 3rd story (called the 2nd story on the drawings) through the 12th story (called the 11th story on the drawings) within a 12 story high-rise building. A total of 10 stories will be affected. In addition, to constructed 1-hr corridor walls on the 4th story (called the 3rd story on the drawings) through the 12th story (called the 11th story on the drawings). A total of 9 stories will be affected. This permit is intended to be a phased shell permit. See permit BLD04-02348 for the first phase shell permit. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. Work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/19/20104/19/20104/21/2010 PASS
DetailsDave Hannah
DOC - Permit Finaled4/21/20104/21/20104/21/2010APASS
DetailsDave Hannah
BLD-Aging Inspection12/8/200912/8/200912/16/2009 PASS
DetailsDave Hannah
marva will schedule finals
BLD-Conference5/7/20075/7/20075/7/2007PDONE
DetailsDave Hannah
Dave this is the one I called you about...Dixie
BLD-Framing/Rough-in9/11/20069/11/20069/11/2006PPART
DetailsDave Hannah
dennis Note: 8th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover
BLD-Framing/Rough-in8/28/20068/29/20068/29/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/28/2006 at 12:55:33 PM. Contact: ###-####.5th and 6th floor control room duct work ok
BLD-Framing/Rough-in8/24/20068/24/20068/24/2006PPART
DetailsDave Hannah
###-#### - dennis Note: duct work 9th 5th and 6th ok
BLD-Framing/Rough-in3/1/20063/2/20063/2/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/1/2006 at 2:55:05 PM. Contact: ###-####. second floor ok to install ceiling
BLD-Framing/Rough-in2/24/20062/27/20062/27/2006APART
DetailsDave Hannah
request 1st thing///dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corr walls 5th and 6th fl ok to cover