Code Occupancy Approval | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PASS |
Scott M.Brown
|
|
|
OK FINAL SIGNED OFF
|
Permanent Occupancy | | 11/20/2006 | 11/20/2006 | | DONE |
|
|
|
|
BLD-Final | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PART |
Tom Arcoraci
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith this will be ok for temp occ when planning is ok with contstruction change
|
BLD-Conference | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/15/2006 at 11:58:39 AM. Contact: ###-####.
|
FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 | P | PART |
Forrest France
|
|
|
Corrections for Building 1414 per previous c/n have been verified for completion, inspeciton passed.
|
BLD-Final | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | FAIL |
Forrest France
|
|
|
SD within 20' of a cooking appliance must be "push to silence" or of the photoelectric type, SD must not be located within 3' of an adjacent opening to a room containing a shower, detectors at two locations need the dust covers removed before final.
|
FIRE-Final Inspection | 11/6/2006 | 11/7/2006 | 11/7/2006 | P | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 10/24/2006 | 10/24/2006 | 10/24/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 8/21/2006 | 8/22/2006 | 8/22/2006 | A | PASS |
Tom Arcoraci
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PART |
Tom Arcoraci
|
|
|
Roof and exterior wall nailing inspection.; Phone #: ###-#### Internet Inspection Request from: Steve Dresser
|
BLD-Wall cover | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Mike Jordan
|
|
|
Karl - exterior sheeting; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|