BLD-Final | 7/7/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Jim Sly
|
|
|
Alan ###-####, need perm. occupancy OK for Perm Occ. J Sly
|
FIRE-Final Inspection | 7/7/2008 | 7/8/2008 | 7/8/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Code Occupancy Approval | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PASS |
Carol Montgomery
|
|
|
Meets compliance. Final O.K.
|
BLD-Conference | 2/20/2008 | 2/21/2008 | 2/21/2008 | P | NH |
Jim Sly
|
|
|
Called ###-#### Left message to call me back.....Ted Masons office. Has not returned phone call.
|
BLD-Conference | 2/19/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Jim Sly
|
|
|
Called Ted Mason left V/M
|
BLD-Aging Inspection | 2/18/2008 | 2/18/2008 | 2/19/2008 | | PEND |
Jim Sly
|
|
|
|
BLD-Final | 7/26/2006 | 7/27/2006 | 7/27/2006 | P | PART |
Jim Sly
|
|
|
vern ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley OK for Temp Occ..............OK to Perm, when Code Enforce and Fire Perms.
|
FIRE-Final Inspection | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the south tenant is complete
|
BLD-Final | 7/24/2006 | 7/25/2006 | 7/25/2006 | P | CANC |
Jim Sly
|
|
|
Vern; Phone #: ###-#### : ) Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm inspection failed
|
BLD-Final | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | CANC |
Jim Sly
|
|
|
vern - late afternoon if possible; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Final Inspection | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | FAIL |
Troy Cobbley
|
|
|
Still need the fire alarm permit finaled. Life safety for the shell and Sign Company tenant is ok for a temporary occupancy once the fire alarm is a go. The south tenant work is ongoing at this time.
|
FIRE-Final Inspection | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | FAIL |
Troy Cobbley
|
|
|
The fire alarm and fire spirnkler permits need t be finaled, exit signs and emergency lights need repaired and approved hardware installed on the second floor restroom doors.
|
BLD-Energy code compliance | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Jim Sly
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 3/22/2006 | 3/22/2006 | 3/22/2006 | P | PASS |
Jim Sly
|
|
|
Vern -- prefer late afternoon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | PART |
Jim Sly
|
|
|
Vern; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Interior pads at N. 1/2 of Bldg (only)
|