Code Occupancy Approval Temp | 11/7/2006 | 11/7/2006 | 11/21/2006 | P | PASS |
Scott M.Brown
|
|
|
STRIPPING AND DUMPSTER GATES NOT IN, TO BE DONE IN 48 HOURS. I SIGNED TEMP ONLY TILL MONDAY, IF THESE NOT IN WILL BOND.
|
BLD-Final | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PASS |
Mike Jordan
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PASS |
Mike Jordan
|
|
|
letter of compliance issued for shell and core. All issues have been resolved.
|
BLD-Final | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | NR |
Mike Jordan
|
|
|
Harold; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Lock indicator installed, all other issues have been resolved. Needs code enforcement to final and final out mech. permit from debest.
|
BLD-Final | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Mike Jordan
|
|
|
harold ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok for temp occ. Needs to install locking indicator, complete firecaulking, provide final aff. letter from special insp. agency and get final from code enforcement.
|
FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PASS |
Forrest France
|
|
|
Shell fire life safety inspection is acceptable pending the installation of a visual indicator at the main entry/exit door at the 1st floor lobby south.
|
FIRE-Final Inspection | 11/1/2006 | 11/2/2006 | 11/3/2006 | P | CANC |
Forrest France
|
|
|
Life safety final pending project related FIR permit finals.
|
FIRE-Final Inspection | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | CANC |
Forrest France
|
|
|
Duplicate inspection request already called in.
|
BLD-Framing/Rough-in | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PART |
Mike Jordan
|
|
|
###-#### - harold. Inspected framing for 1hr stair enclosures and 1hr elevator shaft as wel as framing for corridor upstairs. Needs to provide UL listings from sub cont. for rated penetrations.
|
BLD-Foundation | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/3/2006 at 11:17:51 AM. Contact: ###-####. Reveiwed special insp reports and visually inspected panel to footing connections and panel to panel connections.
|
BLD-Concrete | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/8/2006 at 7:49:13 AM. Contact: ###-####. Tilt panels. wip
|
BLD-Footing | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | PART |
Mike Jordan
|
|
|
gary jones; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. NE footing line.
|
BLD-Footing | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | PART |
Mike Jordan
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Perimeter stem walls.
|