Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-03295
StatusFinaled
Name PETRA INC
Site Address 7316 W FAIRVIEW AVE
Project NameGold's Gym @ Fairview
Customer Number 
ePlanReviewNo
Description
RCE # 1875 IS FOR PETRA INC (Gold's Gym )(To convert an existing retail building to a new athletic club) - To demolish and remove all interior walls, ceilings and mezzanine floor structure, as well as, all exterior awnings. To demolish and removed all electrical, plumbing fixtures and mechanical equipment. This building will be taken down to a shell condition. To construct all new walls and ceilings to create office and reception areas, exercise areas, locker rooms, tanning areas, kids area, basketball area and swimming pool, sauna and spa room. These areas are within the 38,350 square foot main floor. To construct a new 2,975 square foot mezzanine at the south side of the building that will include offices restrooms and a breakroom. There will also be structural roof modifications. This building is fully fire sprinklered. The sprinklers are used for area increase. The first floor is using the separated use option to separate the B occupancies from the A occupancies for allowable area. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 2/26/20072/26/2007 DONE
Details
Code Occupancy Approval2/23/20072/23/20072/23/2007PPASS
DetailsScott M.Brown
OK FOR FINAL AND RELEASE OF BOND
BLD-Wall cover12/4/200612/5/20062/22/2007ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/4/2006 at 2:26:20 PM. Contact: ###-####.
BLD-Final12/27/200612/27/200612/27/2006PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/27/2006 at 8:40:16 AM. Contact: ###-####.
OK for Temp Occ......... OK for Perm Occ, when Electr, P&Z, and Plumb signs off Perm Occ.
BLD-Final12/22/200612/26/200612/26/2006PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/22/2006 at 1:04:24 PM. Contact: ###-####.
Need all req signatures.
FIRE-Final Inspection12/22/200612/26/200612/26/2006APASS
DetailsForrest France
Corrections have been completed, final life safety inspection passed.
BLD-Final12/21/200612/22/200612/22/2006PNR
DetailsTom Arcoraci
pat; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection12/21/200612/22/200612/22/2006AFAIL
DetailsTroy Cobbley
Repair and add emergency lights as marked on the electrical prints and provide the resubmittal plan sheet L-1 that addresses the islands and trees blocking fire dept. access.
Code Occupancy Approval Temp12/22/200612/22/200612/22/2006PDONE
DetailsCarol Montgomery
Bond is in place. Signed temporary - need small amt. of cncrete in ne cor. of bldg.; H/C parking signs, Bike rack
BLD-Conference12/18/200612/19/200612/19/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/18/2006 at 11:30:10 AM. Contact: ###-####.
BLD-Framing/Rough-in12/5/200612/7/200612/7/2006PDONE
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####.
BLD-Wall cover12/5/200612/7/200612/7/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in12/5/200612/5/200612/5/2006PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/5/2006 at 7:35:35 AM. Contact: ###-####.
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PPART
DetailsTom Arcoraci
pat ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok
BLD-Wall cover10/20/200610/20/200610/20/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/20/2006 at 7:28:20 AM. Contact: ###-####.
BLD-Energy code compliance9/29/200610/2/200610/2/2006APART
DetailsTom Arcoraci
wip ok for cover
BLD-Wall cover9/29/20069/29/20069/29/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/29/2006 at 11:11:06 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in9/15/20069/18/20069/18/2006PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/15/2006 at 4:28:02 PM. Contact: (208) wip ok
BLD-Foundation8/16/20068/16/20068/16/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/16/2006 at 10:06:59 AM. Contact: ###-####.
BLD-Foundation8/15/20068/15/20068/15/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/15/2006 at 9:07:25 AM. Contact: ###-####.
BLD-Framing/Rough-in7/19/20067/20/20067/20/2006APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/19/2006 at 11:27:58 AM. Contact: ###-####. mens room upper area ok to rock
BLD-Footing7/5/20067/5/20067/5/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/5/2006 at 11:28:22 AM. Contact: ###-####.
BLD-Footing6/29/20066/30/20066/30/2006APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/29/2006 at 1:00:02 PM. Contact: ###-####.
Six column pad footings at front of Bldg.....Appr plan sheet S-0 No special insp req.....but does not specify 2500PSI design .......Asked Steve to Check with Struct Engineer if special insp req.
BLD-Aging Inspection6/21/20066/21/20066/23/2006 PASS
DetailsTom Arcoraci
BLD-Footing6/21/20066/21/20066/22/2006PPART
DetailsDave Hannah
###-#### - steve - Note: rebar seven column pads ok to pour
BLD-Foundation6/21/20066/21/20066/21/2006 CANC