Permanent Occupancy | | 2/26/2007 | 2/26/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 2/23/2007 | 2/23/2007 | 2/23/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL AND RELEASE OF BOND
|
BLD-Wall cover | 12/4/2006 | 12/5/2006 | 2/22/2007 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 2:26:20 PM. Contact: ###-####.
|
BLD-Final | 12/27/2006 | 12/27/2006 | 12/27/2006 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/27/2006 at 8:40:16 AM. Contact: ###-####. OK for Temp Occ......... OK for Perm Occ, when Electr, P&Z, and Plumb signs off Perm Occ.
|
BLD-Final | 12/22/2006 | 12/26/2006 | 12/26/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/22/2006 at 1:04:24 PM. Contact: ###-####. Need all req signatures.
|
FIRE-Final Inspection | 12/22/2006 | 12/26/2006 | 12/26/2006 | A | PASS |
Forrest France
|
|
|
Corrections have been completed, final life safety inspection passed.
|
BLD-Final | 12/21/2006 | 12/22/2006 | 12/22/2006 | P | NR |
Tom Arcoraci
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | FAIL |
Troy Cobbley
|
|
|
Repair and add emergency lights as marked on the electrical prints and provide the resubmittal plan sheet L-1 that addresses the islands and trees blocking fire dept. access.
|
Code Occupancy Approval Temp | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | DONE |
Carol Montgomery
|
|
|
Bond is in place. Signed temporary - need small amt. of cncrete in ne cor. of bldg.; H/C parking signs, Bike rack
|
BLD-Conference | 12/18/2006 | 12/19/2006 | 12/19/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2006 at 11:30:10 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/5/2006 | 12/7/2006 | 12/7/2006 | P | DONE |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####.
|
BLD-Wall cover | 12/5/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:35:35 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PART |
Tom Arcoraci
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok
|
BLD-Wall cover | 10/20/2006 | 10/20/2006 | 10/20/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/20/2006 at 7:28:20 AM. Contact: ###-####.
|
BLD-Energy code compliance | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | PART |
Tom Arcoraci
|
|
|
wip ok for cover
|
BLD-Wall cover | 9/29/2006 | 9/29/2006 | 9/29/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/29/2006 at 11:11:06 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 9/15/2006 | 9/18/2006 | 9/18/2006 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 4:28:02 PM. Contact: (208) wip ok
|
BLD-Foundation | 8/16/2006 | 8/16/2006 | 8/16/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/16/2006 at 10:06:59 AM. Contact: ###-####.
|
BLD-Foundation | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/15/2006 at 9:07:25 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/19/2006 at 11:27:58 AM. Contact: ###-####. mens room upper area ok to rock
|
BLD-Footing | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/5/2006 at 11:28:22 AM. Contact: ###-####.
|
BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/29/2006 at 1:00:02 PM. Contact: ###-####. Six column pad footings at front of Bldg.....Appr plan sheet S-0 No special insp req.....but does not specify 2500PSI design .......Asked Steve to Check with Struct Engineer if special insp req.
|
BLD-Aging Inspection | 6/21/2006 | 6/21/2006 | 6/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 6/21/2006 | 6/21/2006 | 6/22/2006 | P | PART |
Dave Hannah
|
|
|
###-#### - steve - Note: rebar seven column pads ok to pour
|
BLD-Foundation | 6/21/2006 | 6/21/2006 | 6/21/2006 | | CANC |
|
|
|
|