BLD-Final | 4/19/2007 | 4/19/2007 | 4/19/2007 | P | PASS |
Jim Sly
|
|
|
this just had a temp final now needs a final ###-#### Alan OK for Perm Occ. :)
|
Permanent Occupancy | | 4/19/2007 | 4/19/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 4/18/2007 | | PASS |
|
|
|
|
FIRE-Final Inspection | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 10/25/2006 | 10/25/2006 | 10/25/2006 | P | PART |
Jim Sly
|
|
|
Alan = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt OK for Temp Occ. .......... OK for Perm Occ. when Code Enforce Perms
|
FIRE-Final Inspection | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need fire alarm permits finaled first. The fire alarm permit was failed.
|
BLD-Conference | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PASS |
Jim Sly
|
|
|
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Energy code compliance | 6/30/2006 | 7/5/2006 | 7/5/2006 | A | PASS |
Jim Sly
|
|
|
late am please// vern ###-####
|
BLD-Framing/Rough-in | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PASS |
Jim Sly
|
|
|
vern Note: 1st floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 1st Flr framing OK
|
BLD-Framing/Rough-in | 5/11/2006 | 5/12/2006 | 5/12/2006 | A | PART |
Jim Sly
|
|
|
partial framing insp///vern; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK to cover 1st flr ceiling and 2nd flr walls
|
BLD-Final | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | NR |
Jim Sly
|
|
|
Ted ###-####
|
BLD-Footing | 2/8/2006 | 2/9/2006 | 2/9/2006 | A | PART |
Mike Jordan
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior column pad footings for second floor addition.
|