BLD-Final | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/3/2006 at 1:43:20 PM. Contact: ###-####. OK for Perm Occ. :)
|
Permanent Occupancy | | 3/6/2006 | 3/6/2006 | | DONE |
|
|
|
|
BLD-Final | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/27/2006 at 4:04:32 PM. Contact: ###-####.
|
FIRE-Final Inspection | 2/27/2006 | 2/28/2006 | 2/28/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 2/26/2006 | 2/27/2006 | 2/27/2006 | P | FAIL |
Troy Cobbley
|
|
|
provide exit signs as per the approved plans and provide sensors for the door mags and test
|
BLD-Framing/Rough-in | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | PASS |
Jim Sly
|
|
|
ceiling grid-mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 2/10/2006 | 2/13/2006 | 2/13/2006 | A | PART |
Jim Sly
|
|
|
ceiling grid inspec///mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK to install border tile at approx 6 offices along S wall of Bldg
|
BLD-Framing/Rough-in | 1/24/2006 | 1/25/2006 | 1/25/2006 | A | PASS |
Jim Sly
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|