BLD-Final | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Jim Sly
|
|
|
All required signatures done. OK for Occ.
|
DOC - Permit Finaled | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | CANC |
Jim Sly
|
|
|
Vlad phone
|
BLD-Aging Inspection | 7/27/2009 | 7/27/2009 | 7/27/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/7/2008 | 4/8/2008 | 4/8/2008 | A | PASS |
Jim Sly
|
|
|
boris Phone #: ###-#### OK for Perm Occ........Checked HVAC and Fire......Both OK for Perm Occ. :)
|
BLD-Final | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | NR |
Jim Sly
|
|
|
Boris...###-#### Still firestopping penitrations in Mech and storage room ceilings.
|
BLD-Final | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | CANC |
Jim Sly
|
|
|
Boris = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Re-scheduled
|
FIRE-Final Inspection | 3/26/2008 | 3/26/2008 | 3/26/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Four exit signs and two exit discharge lights still need to be added. See the electrical sheets of the approved basement plans for the locations with astericks.
|
BLD-Final | 3/11/2008 | 3/11/2008 | 3/11/2008 | P | NR |
Jim Sly
|
|
|
borus Phone #: ###-#### Need Fire final
|
FIRE-Final Inspection | 3/3/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Troy Cobbley
|
|
|
The upper level life safety is passed. The lower level is failed. There are missing exit discharge lights, emergency lights and exit signs.
|
BLD-Energy code compliance | 10/8/2007 | 10/10/2007 | 10/9/2007 | P | PASS |
Jim Sly
|
|
|
forest Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2007 | 10/3/2007 | 10/4/2007 | P | PART |
Jim Sly
|
|
|
doris Note: please call 1/2 hr prior Phone #: ###-#### E. third of basement....OK
|
FIRE-Final Inspection | 9/18/2007 | 9/24/2007 | 9/24/2007 | A | FAIL |
Troy Cobbley
|
|
|
Boris just needed occupancy for the upstairs area which was going to be alowed per a previous agreement with dave hanniman. Life safety items are ok upstairs except for the exit signs and emergency lights that need to be installed and or repaired. I told boris I could not give him a sign off on the upstairs portion until these items were done.
|
BLD-Framing/Rough-in | 9/17/2007 | 9/18/2007 | 9/18/2007 | A | CANC |
Mike Jordan
|
|
|
Basement area only please--boris
|
BLD-Final | 9/17/2007 | 9/18/2007 | 9/18/2007 | A | CANC |
Jim Sly
|
|
|
upstairs and 1/2 of basement please--Boris Talked to Boris........Need Plumb...Electr..... and Mech finals......Need Occ Req card......Need Fire final....Prior to calling for struct final Boris...###-####
|
BLD-Final | 12/13/2006 | 12/14/2006 | 12/14/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/13/2006 at 10:11:08 AM. Contact: ###-####. Need all req signatures.
|
FIRE-Conference | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | DONE |
Troy Cobbley
|
|
|
I went over fire extinguisher, exit lights and emergency light placement with Bill. Also discussed was door hardware issues and exit discharge light issues. Per Carl Westfalls and I's discussion exit discharge lights will be required at both of the stairways from the basement.
|
BLD-Framing/Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | PASS |
Jim Sly
|
|
|
vlad - call 1/2 hour prior to insp; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 5/16/2006 | 5/18/2006 | 5/18/2006 | A | PART |
Jim Sly
|
|
|
vlad//please call 30 min prior to inspection; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Framing OK on 1st phase.......1st phase includes 1st and 2nd story.......West 2/3 of building. OK to insulate this area only.
|
BLD-Foundation | 5/17/2006 | 5/18/2006 | 5/18/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/17/2006 at 5:15:19 PM. Contact: ###-####. Wall for Ext. stairway at S. side of Bldg. OK
|
BLD-Footing | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/16/2006 at 7:08:44 PM. Contact: ###-####. footing for new stairway from basement.
|
BLD-Framing/Rough-in | 5/11/2006 | 5/15/2006 | 5/15/2006 | A | NR |
Mike Jordan
|
|
|
vlad; Phone #: ###-#### Note: please call 1/2 hr prior Internet Inspection Request from: Cathy Chiles. No access to interior of bldg.
|
FIRE-Conference | 5/4/2006 | 5/4/2006 | 5/4/2006 | P | DONE |
Troy Cobbley
|
|
|
Contractor requested the use of the finished areas of the church while construction continued in the recreation area. Dave Hanneman agreed as long as all life safety items had been completed in the areas to be occupied. At this point the project is not ready for inspection.
|
BLD-Conference | 5/3/2006 | 5/3/2006 | 5/3/2006 | P | DONE |
Jim Sly
|
|
|
Vlad - please call 1/2 hr before; Phone #: ###-#### Internet Inspection Request from: Ione Coleman Met with Vlad....walk thru. Wants to phase Constr. and Temp part of Bldg. Need to OK with fire Dept then OK with me.
|
BLD-Conference | 3/15/2006 | 3/15/2006 | 3/15/2006 | P | DONE |
Jim Sly
|
|
|
vlad; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Met with Plumb Contr. Talked about where he can bore holes in floor joists. Looked at footing for CMU wall near elevator lift.
|
BLD-Conference | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | DONE |
Jim Sly
|
|
|
Vlad; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong and John Cook (Arch) to discuss plans. Met with Vlad
|