BLD-Final | 6/2/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
|
Code Occupancy Approval | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF
|
FIRE-Final Inspection | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent Occupancy | | 6/5/2006 | 6/5/2006 | | DONE |
|
|
|
|
BLD-Final | 5/4/2006 | 5/5/2006 | 5/5/2006 | P | NR |
Jim Sly
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Fire final prior to calling for structural final.
|
FIRE-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire hydrant per notes and drawing sheet A.1, repair exit sign and provide annual inspection tag for the fire extinguisher
|
BLD-Energy code compliance | 3/22/2006 | 3/22/2006 | 3/22/2006 | P | PASS |
Tom Arcoraci
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 3/20/2006 | 3/21/2006 | 3/21/2006 | P | PART |
Jim Storey
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 18 inches clearance to pull side of office door. ok to insulate.
|
BLD-Concrete | 2/17/2006 | 2/17/2006 | 2/17/2006 | P | PASS |
Jim Storey
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie vapor barrior ok under slab on grade.
|
BLD-Foundation | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PART |
Mike Jordan
|
|
|
late am please//john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/8/2006 | 2/9/2006 | 2/9/2006 | A | PASS |
Jim Storey
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|