Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-03448
StatusFinaled
Name WENSEL CONSTRUCTION
Site Address 1111 W JEFFERSON ST
Project NameBoise Cascade Bldg.
Customer Number 
ePlanReviewNo
Description
(BOISE - BASEMENT - CODE UPGRADE) Interior remodel in the 77,950 sq. ft. basement to comply with a 9/28/00 Upgrade Agreement on file (modified under this permit) in an existing 322,795 sq. ft. high-rise building per approved plans. Work to include installing quick-response sprinkler heads where required throughout the basement floor, some miscellaneous interior demolition work, providing a new mechanically ventilated vestibule with 2-hour rated wall and 20 minute rated door within the existing northeast smokeproof enclosure stair, some new interior walls, some new interior doors, interior finish work, upgrading some restrooms to comply with current accessibility standards, constructing two new accessible restroom/shower rooms, some new noncombustible accessible ramps with handrails, a new noncombustible interior stairway with two risers and handrails, fire sprinkler work, fire alarm work, mechanical work, plumbing work, and electrical work. Work will also include installing new doors in the atrium on levels 1, 2, 3, and 5, floors that are above the main/ground floor. Final approval of the atrium doors will be deferred until approval of the doors by the design engineer of the atrium when atrium upgrades occur under a future separate permit. Additional testing of the doors may need to occur at that time. A Certificate of Occupancy for the basement is to be issued when completed and approved. NOTE: The basement is fully fire sprinklered. The entire building will be fully fire sprinklered by March of 2011 per another Upgrade Agreement on file. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference11/1/200711/1/200711/1/2007PPASS
DetailsTony Young
Steve; Phone #: ###-####
permit is ok for full c of o
BLD-Final10/18/200710/18/200710/18/2007PPASS
DetailsTony Young
steve Phone #: ###-####
ok for perm occ. on this section of building
FIRE-Final Inspection10/8/200710/9/200710/9/2007APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/5/200710/8/200710/8/2007APART
DetailsTony Young
kirt Phone #: ###-####
ok pending others
BLD-Final8/31/20069/5/20069/5/2006APART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to use ada rest rooms
FIRE-Final Inspection8/31/20069/1/20069/1/2006APART
DetailsForrest France
Inspection for the remodeled restrooms and one adjacent confrence room is satisfactory, final pending project related fire sprinkler permit final.
BLD-Framing/Rough-in7/26/20067/26/20067/26/2006PPART
DetailsDave Hannah
Curt ###-#### rest room wall in basement ok to cover
BLD-Framing/Rough-in7/25/20067/26/20067/26/2006ACANC
DetailsTony Young
curt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
out of time,, rescheduled for pm
BLD-Framing/Rough-in7/10/20067/10/20067/10/2006PPART
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover basement shower rooms
FIRE-Conference5/22/20065/25/20065/26/2006PPART
DetailsForrest France
Inspection to verify completion of previous correction notice items, also tested access controlled atrium doors on floors 1-5 for functionality, tested emergency lighting and exit signage on backup power for the basement only, verified mag lock dropout upon fire alarm at access controlled doors, tested door release at basement elevator lobby. The project related fire sprinkler permit must be finaled prior to final approval for the basement code upgrade permit.
FIRE-Conference5/12/20065/19/20065/19/2006PCANC
DetailsTroy Cobbley
Per the contractor this conference had been canceled earlier.
BLD-Conference5/8/20065/9/20065/9/2006ADONE
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
FIRE-Conference5/4/20065/5/20065/5/2006APART
DetailsForrest France
Some items on correction notice have been completed including door hardware, fire ext., occupant load sign, fire sprinkler. Need to provide directional arrow at the exit sign adjacent to the SW exit stairs, remove clasp for surface lock at the pantry, provide occupant load sign in the meeting room. Still need to verify emergency lighting and exit sign illumination for the path of egress, and door lock dropout upon fire alarm activation.
FIRE-Conference5/3/20065/4/20065/4/2006ANR
DetailsForrest France
Field inspection to be scheduled for 5/5 in the AM as agreed.
BLD-Conference5/3/20065/3/20065/3/2006PPART
DetailsDave Hannah
kirt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked basement found several doors that need tobe up graded to 90 min also need to talk to jason about 2hr walls
BLD-Final4/24/20064/26/20064/26/2006AFAIL
DetailsTony Young
Gary ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
need trades 1st,, no inspection made
FIRE-Final Inspection4/24/20064/25/20064/26/2006PFAIL
DetailsForrest France
Several issues need addressed as discussed on site regarding life safety inspection for the basement only including door hardware (knobs at stairway exits, manual flush bolts on inactive leafs, padlocks on cooler and storage rooms, missing closures and seals at rated room doors, etc.), exit signs at some areas are not illuminated or need relocation, fire extinguishers shall be mounted no higher than 48" AFF, some locations may be overspaced to the nearest FE (75' max travel), provide max occupant load sign for the meeting room, need to test emergency lighting for the path of egress, access controlled egress doors shall be tested for loss of power and alarm at the mag locks, provide smoke detection for the battery room (a HD appears to be installed), one 200 deg. QR head needs replaced as noted, per the upgrade agreement some required alarm and sprinkler issues related to the basement are not completed at this time. Not all items reviewed at this inspection, contractor to re-schedule when general noted issues have been corrected.