Permit Information
Permit NumberBLD05-03467
StatusFinaled
Name BARCLAY CONSTRUCTION
Site Address 512 N AVENUE I AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To demolish a 900sq.ft. existing dwelling and construct a New 2888sq.ft. Two story single family dwelling (1478sq.ft. Lower floor / 1410sq.ft. Upper floor) with a 152sq.ft. Covered front porch, and a 611sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. R-2 zoning/setbacks as per T.C. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/200610/25/200610/26/2006PPASS
DetailsDave Hannah
Please call Rob ###-#### for access; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
DOC - Permit Finaled10/26/200610/26/200610/26/2006PPASS
DetailsDave Hannah
DOC - Permit Finaled10/25/200610/25/200610/25/2006PPASS
DetailsDave Hannah
BLD-Final10/23/200610/24/200610/24/2006PFAIL
DetailsDave Hannah
Please call ###-#### or ###-#### for garage access code.; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN needs adress fix first riser on stairs and fix stairs into garage
BLD-Framing/Rough-in5/8/20065/9/20065/9/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
BLD-Energy code compliance5/5/20065/8/20065/8/2006APASS
DetailsDave Hannah
Please schedule w/framing reinspection; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN ok to cover
BLD-Framing/Rough-in5/2/20065/3/20065/3/2006PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN c/n on site ok to insulate
BLD-Footing2/9/20062/9/20062/9/2006PPART
DetailsTony Young
Santos -- would like insp at 2:30 pm -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
footing is w i p,, BUT the owner may change her mind on design or ???,, may hold off on pour,,, ok to pour today if no changes occur
BLD-Other2/3/20062/3/20062/3/2006PPASS
DetailsDave Hannah
Foundation prep in progress ok for demo bond release.
BLD-Other1/25/20061/25/20061/25/2006APART
DetailsDave Hannah
Demolition complete, ok for bond release when footing/foundation work begins.