BLD-Final | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
kent ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
DOC - Permit Finaled | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | P | NR |
Mike Jordan
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | NR |
Mike Jordan
|
|
|
Kent; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needs other trades to final.
|
Code Occupancy Approval | 4/9/2007 | 4/9/2007 | 4/9/2007 | P | PASS |
Scott M.Brown
|
|
|
ok for final
|
BLD-Final | 4/6/2007 | 4/9/2007 | 4/9/2007 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 2:39:28 PM.
|
FIRE-Final Inspection | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | PASS |
Mike Jordan
|
|
|
kent ###-####. Framing for vestibule at outdoor patio for old chicago.
|
BLD-Framing/Rough-in | 10/26/2006 | 10/27/2006 | 10/27/2006 | A | PART |
Mike Jordan
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. 2hr shaft wall, inner layer.
|
BLD-Framing/Rough-in | 10/13/2006 | 10/17/2006 | 10/17/2006 | A | PASS |
Mike Jordan
|
|
|
kent bowman ###-####. Framing at North tower. Verified holdowns and strapping.
|
BLD-Framing/Rough-in | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | PART |
Mike Jordan
|
|
|
Kent, ###-#### - partial only please. Lower tower and columns, canopy framing.
|
BLD-Final | 9/28/2006 | 9/28/2006 | 9/29/2006 | P | PART |
Mike Jordan
|
|
|
Kent, ###-####. THIS IS NOT REALLY A BLDG. FINAL. Pertains to maintenance bldg. addition only. All other trades have been sighned off on maintenance bldg. Mall wants to occupy this portion only. Checked with code enforcement and noted that no bond was needed. Ok to use maintenance bldg. only.
|
FIRE-Final Inspection | 9/28/2006 | 9/28/2006 | 9/28/2006 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually for the addition to the maintenance shop. Life safety for this area only is passed. Fire sprinklers finished in this area.
|
FIRE-Final Inspection | 9/27/2006 | 9/27/2006 | 9/28/2006 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
BLD-Final | 9/26/2006 | 9/27/2006 | 9/27/2006 | A | NR |
Mike Jordan
|
|
|
kent - ###-#### final for maintenance building only . For maint. bldg. only. Still needs life/safety insp.
|
BLD-Framing/Rough-in | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PASS |
Mike Jordan
|
|
|
###-#### - kent. Upper tower framing.
|
BLD-Other | 9/11/2006 | 9/12/2006 | 9/12/2006 | A | PART |
Mike Jordan
|
|
|
###-#### - KENT - NOTE: WALL. 2 inch furout wall, 2nd floor.
|
BLD-Conference | 9/7/2006 | 9/8/2006 | 9/8/2006 | A | PASS |
Mike Jordan
|
|
|
kent bowman - ###-####. Grid ok. Also went over shaft wall and fireblocking requirements.
|
BLD-Wall cover | 9/7/2006 | 9/7/2006 | 9/7/2006 | P | PART |
Mike Jordan
|
|
|
###-#### - kent Note: wall framing. 2nd floor. Ceiling grid framing at lower roof. No approved details could be found. Contractor to schedule bldg. confrance tommorow.
|
BLD-Wall cover | 9/5/2006 | 9/6/2006 | 9/6/2006 | A | PASS |
Mike Jordan
|
|
|
###-#### - kent Note: wall framing. 2nd floor to top of wall exterior steel stud framing. Needs to install rock wall for fireblocking at floor ceiling lines.
|
BLD-Footing | 8/10/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Mike Jordan
|
|
|
jeremy - old chicago vestibule ###-####.
|
BLD-Framing/Rough-in | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | PASS |
Mike Jordan
|
|
|
jeremy - ###-####. exterior steel stud framing at sw end od bldg. (newq storefront.)
|
BLD-Energy code compliance | 8/3/2006 | 8/4/2006 | 8/4/2006 | A | PASS |
Mike Jordan
|
|
|
###-#### - jeremy. maintenance bldg.
|
BLD-Framing/Rough-in | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | PASS |
Mike Jordan
|
|
|
Jeremy, ###-####. Interior stell stud framing at maintenance bldg.
|
BLD-Footing | 7/27/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Mike Jordan
|
|
|
jeremy - ###-####. Column pad fottings and grade beam footings on grid C.9 between grids 5 to 6. All reinforcement was as per approved plans. Also verified correct mix design for conc. placement. Noted no special insp. on site at time of conc. placement.
|
BLD-Footing | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PART |
Mike Jordan
|
|
|
###-#### - jeremy Note: if possible NOON. wip on coplumn pad footings by main enterance.
|
BLD-Framing/Rough-in | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | PASS |
Mike Jordan
|
|
|
jeremy - ###-#### per rita - modification Reveiwed new UL listing for 2hr wall, consisting of 2 layers of 5/8 type X densglass, with typex rock on interior side.,
|
BLD-Framing/Rough-in | 6/21/2006 | 6/21/2006 | 6/21/2006 | P | FAIL |
Mike Jordan
|
|
|
duncan ###-####. Southwall not per approved UL listing for 2hr. wall. Contractor to get alternate method from architect if possible.
|
BLD-Footing | 6/19/2006 | 6/19/2006 | 6/20/2006 | P | DEFR |
Mike Jordan
|
|
|
###-#### rebar inspection. light pole base, non structural item.
|
BLD-Other | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/30/2006 at 11:59:32 AM. Contact: ###-####.
|
BLD-Footing | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Mike Jordan
|
|
|
jeremy -; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Column pad footings at grids 13 to 14 and grids A to A.5.
|
BLD-Other | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:05 AM. Contact: ###-####. Masonry insp. for maintenance bldg. Inspected rebar from 0 to 4ft. elev. Masons are planning 8ft high lift grout. Contractor noted that engineer has approved high lift grout and wiil send letter. Special insp. to verify cleanouts and that all steel is tied into place prior to grouting.
|
BLD-Footing | 5/18/2006 | 5/19/2006 | 5/19/2006 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/18/2006 at 9:06:33 AM. Contact: ###-####. footing and column pad footings on grids 7.4 to 10 and grids aa.1 to aa.4. top rebar mats missing in the column pad footings. Special insp. to verify the install of all missing rebar.
|
BLD-Footing | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/11/2006 at 7:35:58 AM. Contact: ###-####. Extension of exsiting column pad footing.
|
BLD-Footing | 5/10/2006 | 5/10/2006 | 5/10/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 7:30:37 AM. Contact: ###-####. Footings for maintenance bldg. Special insp to verify addition of # 6 verts at 10ft overhrad doors.
|