Permit Information
Permit NumberBLD06-00007
StatusFinaled
Name CAMCO CONSTRUCTION
Site Address 350 N MILWAUKEE ST
Project NameBOISE TOWNE SQUARE EXPANSION
Customer Number 
ePlanReviewNo
Description
Boise Towne Square Expansion - To demolish some exterior walls and interior store front and construct a 3,345 square foot addition on the first floor of the mall, south of the main mall entry. To construct a 1085 square foot, one story addition to the east end of the existing maintenance building. This permit also includes the demolition of the existing main entry masonry and steel archway and the construction of a new roof covered entry with connected exterior architectural towers at the Old Chicago exterior seating area, at the main mall entry and at the exterior entry of mall tenant space #1406. This building is fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/17/20074/17/20074/17/2007PPASS
DetailsTom Arcoraci
kent ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled4/17/20074/17/20074/17/2007PPASS
DetailsTom Arcoraci
BLD-Final4/12/20074/13/20074/13/2007PCANC
DetailsMike Jordan
BLD-Final4/12/20074/13/20074/13/2007PNR
DetailsMike Jordan
Kent; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Final4/12/20074/13/20074/13/2007ANR
DetailsMike Jordan
Kent; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Needs other trades to final.
Code Occupancy Approval4/9/20074/9/20074/9/2007PPASS
DetailsScott M.Brown
ok for final
BLD-Final4/6/20074/9/20074/9/2007ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/6/2007 at 2:39:28 PM.
FIRE-Final Inspection4/5/20074/5/20074/5/2007PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in12/12/200612/13/200612/13/2006APASS
DetailsMike Jordan
kent ###-####. Framing for vestibule at outdoor patio for old chicago.
BLD-Framing/Rough-in10/26/200610/27/200610/27/2006APART
DetailsMike Jordan
ken; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. 2hr shaft wall, inner layer.
BLD-Framing/Rough-in10/13/200610/17/200610/17/2006APASS
DetailsMike Jordan
kent bowman ###-####. Framing at North tower. Verified holdowns and strapping.
BLD-Framing/Rough-in9/29/200610/2/200610/2/2006APART
DetailsMike Jordan
Kent, ###-#### - partial only please. Lower tower and columns, canopy framing.
BLD-Final9/28/20069/28/20069/29/2006PPART
DetailsMike Jordan
Kent, ###-####. THIS IS NOT REALLY A BLDG. FINAL. Pertains to maintenance bldg. addition only. All other trades have been sighned off on maintenance bldg. Mall wants to occupy this portion only. Checked with code enforcement and noted that no bond was needed. Ok to use maintenance bldg. only.
FIRE-Final Inspection9/28/20069/28/20069/28/2006PFAIL
DetailsTroy Cobbley
Inspection was actually for the addition to the maintenance shop. Life safety for this area only is passed. Fire sprinklers finished in this area.
FIRE-Final Inspection9/27/20069/27/20069/28/2006PCANC
DetailsTroy Cobbley
Duplicate inspection
BLD-Final9/26/20069/27/20069/27/2006ANR
DetailsMike Jordan
kent - ###-#### final for maintenance building only . For maint. bldg. only. Still needs life/safety insp.
BLD-Framing/Rough-in9/22/20069/22/20069/22/2006PPASS
DetailsMike Jordan
###-#### - kent. Upper tower framing.
BLD-Other9/11/20069/12/20069/12/2006APART
DetailsMike Jordan
###-#### - KENT - NOTE: WALL. 2 inch furout wall, 2nd floor.
BLD-Conference9/7/20069/8/20069/8/2006APASS
DetailsMike Jordan
kent bowman - ###-####. Grid ok. Also went over shaft wall and fireblocking requirements.
BLD-Wall cover9/7/20069/7/20069/7/2006PPART
DetailsMike Jordan
###-#### - kent Note: wall framing. 2nd floor. Ceiling grid framing at lower roof. No approved details could be found. Contractor to schedule bldg. confrance tommorow.
BLD-Wall cover9/5/20069/6/20069/6/2006APASS
DetailsMike Jordan
###-#### - kent Note: wall framing. 2nd floor to top of wall exterior steel stud framing. Needs to install rock wall for fireblocking at floor ceiling lines.
BLD-Footing8/10/20068/10/20068/10/2006PPASS
DetailsMike Jordan
jeremy - old chicago vestibule ###-####.
BLD-Framing/Rough-in8/7/20068/7/20068/7/2006PPASS
DetailsMike Jordan
jeremy - ###-####. exterior steel stud framing at sw end od bldg. (newq storefront.)
BLD-Energy code compliance8/3/20068/4/20068/4/2006APASS
DetailsMike Jordan
###-#### - jeremy. maintenance bldg.
BLD-Framing/Rough-in8/1/20068/1/20068/1/2006PPASS
DetailsMike Jordan
Jeremy, ###-####. Interior stell stud framing at maintenance bldg.
BLD-Footing7/27/20067/28/20067/28/2006PPASS
DetailsMike Jordan
jeremy - ###-####. Column pad fottings and grade beam footings on grid C.9 between grids 5 to 6. All reinforcement was as per approved plans. Also verified correct mix design for conc. placement. Noted no special insp. on site at time of conc. placement.
BLD-Footing7/26/20067/27/20067/27/2006APART
DetailsMike Jordan
###-#### - jeremy Note: if possible NOON. wip on coplumn pad footings by main enterance.
BLD-Framing/Rough-in6/21/20066/22/20066/22/2006APASS
DetailsMike Jordan
jeremy - ###-#### per rita - modification Reveiwed new UL listing for 2hr wall, consisting of 2 layers of 5/8 type X densglass, with typex rock on interior side.,
BLD-Framing/Rough-in6/21/20066/21/20066/21/2006PFAIL
DetailsMike Jordan
duncan ###-####. Southwall not per approved UL listing for 2hr. wall. Contractor to get alternate method from architect if possible.
BLD-Footing6/19/20066/19/20066/20/2006PDEFR
DetailsMike Jordan
###-#### rebar inspection. light pole base, non structural item.
BLD-Other5/30/20065/31/20065/31/2006ADEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/30/2006 at 11:59:32 AM. Contact: ###-####.
BLD-Footing5/26/20065/30/20065/30/2006APASS
DetailsMike Jordan
jeremy -; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Column pad footings at grids 13 to 14 and grids A to A.5.
BLD-Other5/23/20065/23/20065/23/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:05 AM. Contact: ###-####. Masonry insp. for maintenance bldg. Inspected rebar from 0 to 4ft. elev. Masons are planning 8ft high lift grout. Contractor noted that engineer has approved high lift grout and wiil send letter. Special insp. to verify cleanouts and that all steel is tied into place prior to grouting.
BLD-Footing5/18/20065/19/20065/19/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/18/2006 at 9:06:33 AM. Contact: ###-####. footing and column pad footings on grids 7.4 to 10 and grids aa.1 to aa.4. top rebar mats missing in the column pad footings. Special insp. to verify the install of all missing rebar.
BLD-Footing5/11/20065/11/20065/11/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/11/2006 at 7:35:58 AM. Contact: ###-####. Extension of exsiting column pad footing.
BLD-Footing5/10/20065/10/20065/10/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/10/2006 at 7:30:37 AM. Contact: ###-####. Footings for maintenance bldg. Special insp to verify addition of # 6 verts at 10ft overhrad doors.