BLD-Final | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 9:52:17 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Structural inspector to please verify that the suite number gets installed.
|
BLD-Final | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | FAIL |
Dave Hannah
|
|
|
Zack -- pending fire life safety 4-6 PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Dave Hannah
|
|
|
Zack -- pending fire life safety 4-6 PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong needs fire sign offs
|
FIRE-Final Inspection | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide sprinkler head in the closet next to the secretary. Considered an occupiable space. Provide suite number.
|
FIRE-Final Inspection | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 4/7 in the am as discussed.
|
BLD-Framing/Rough-in | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PART |
Dave Hannah
|
|
|
Zach -- ceiling cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling after all other trades have signded off
|
BLD-Conference | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PASS |
Dave Hannah
|
|
|
Zach; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong framing ok to cover after elec
|
FIRE-Conference | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | DONE |
Forrest France
|
|
|
On site discussion regarding tenant improvement modifications that affect fire sprinkler protection and coverage, the proposed work will require a fire sprinkler permit.
|