Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD06-00076
StatusFinaled
Name DON YOUNG CONSTRUCTION
Site Address 1411 W GRAND AVE
Project NameGRAND AVE HOMES BLDG # 3
Customer Number 
ePlanReviewNo
Description
Building # 3 - To construct a new 9,316 square feet, three story, seven unit apartment building. The first floor is 4,484 square feet and 1,100 square feet of this area is for open parking garages. Each unit is over 800 square feet in area. Unit "A" is two story, three bedroom, two bath. Unit "B" is two story, three bedroom, one and one/half bath. Unit "C" is two story, two bedroom one and one/half bath. Units "D & E" are single story two bedroom and one bathroom. Units "f & G" are three bedroom and two bath. NOTE: This building is fully fire sprinklered per NFPA 13-R and is considered as part of building #4 for exterior wall and opening protection per IBC Section 704.3 Exception for one building. All construction per the approved plans and attached comment list. DRH 05-00288 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  5/20/2008 PASS
DetailsWm. Michael Meloy
ok for perm occupancey per Andrea Tuning
BLD-Final3/17/20083/18/20083/18/2008APASS
DetailsDave Hannah
mel Phone #: ###-####
FIRE-Final Inspection3/14/20083/17/20083/17/2008APASS
DetailsForrest France
Items on correction notice are complete, door closures adjacent to the common corridor to be adjusted prior to structural final for verification, remainder of fire life safety inspection passed.
BLD-Final3/13/20083/13/20083/13/2008PFAIL
DetailsForrest France
Need to repair ceiling adjacent to the smoke detector at the riser room, missing required lane marking at the fire dept. access road, incomplete address at one apartment unit, the project related fire sprinkler permit work has failed final inspection.
FIRE-Final Inspection3/12/20083/12/20083/12/2008PNR
DetailsForrest France
Pending alarm and sprinkler finals.
FIRE-Final Inspection3/10/20083/10/20083/11/2008PNR
DetailsForrest France
Need project related fire alarm and sprinkler permit finals prior to building fire life safety approval.
BLD-Energy code compliance10/12/200710/12/200710/15/2007PPASS
DetailsDave Hannah
harvey Phone #: ###-#### Note: please call 1/2 hr prior to inpsection ok to cover
BLD-Framing/Rough-in10/2/200710/3/200710/3/2007APART
DetailsDave Hannah
mel Phone #: ###-#### ok to insulate
BLD-Framing/Rough-in4/25/20074/26/20074/26/2007APART
DetailsDave Hannah
ext shear ok to cover ext
BLD-Framing/Rough-in4/25/20074/25/20074/25/2007PNR
DetailsDave Hannah
Mel; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation3/28/20073/29/20073/29/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/28/2007 at 10:17:59 AM. Contact: ###-####. column pedestals for carports.
BLD-Footing3/15/20073/16/20073/16/2007PPART
DetailsJim Sly
harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Footing pads at rear of bldg #3.....OK
BLD-Foundation2/7/20072/8/20072/8/2007APASS
DetailsDave Hannah
Harvey ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing2/1/20072/2/20072/2/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2007 at 11:14:38 AM. Contact: ###-####.