Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-00078
StatusFinaled
Name JCB INC
Site Address 2362 E ROANOKE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three and one quarter bathroom 2310 sq. ft. two story single family dwelling (822 sq. ft. first floor/1488 sq. ft. second floor) with a attached 816 sq. ft. three car garage, a 582 sq. ft. covered front porch and a 525 sq. ft. deck off the second floor. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. Any and all NFPA 13D systems shall be equipped with an alarm initiating device commonly referred to as a flow switch, and an outside alarm indicating device. A Fire Sprinkler Permit is required prior to beginning any fire sprinkler work OR SUBMIT AN ACCEPTABLE ALTERNATIVE. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/200612/29/200612/29/2006PPASS
DetailsDave Hannah
Cindy Note: call 30 min before insp ; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
DOC - Permit Finaled12/29/200612/29/200612/29/2006PPASS
DetailsDave Hannah
BLD-Final12/22/200612/22/200612/22/2006PNR
DetailsTony Young
j.p. - note - cert. of occupancy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Grading Inspection12/22/200612/22/200612/22/2006 BOND
The rough grading and drainage has been completed at the above mentioned address. However, fine grading, revegetation, the roof drain connection to the ACHD storm drain, and as built grading plans have not been completed. For this the engineer has recommended a bond of $1,500.00. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Final12/21/200612/21/200612/21/2006PFAIL
DetailsDave Hannah
j.p. ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs terrys hillside final and a handrail on stairs of deck also nees to close up openning along side of stairs at riser
BLD-Energy code compliance9/19/20069/20/20069/20/2006APASS
DetailsDave Hannah
cindy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Framing/Rough-in9/13/20069/14/20069/14/2006APART
DetailsDave Hannah
cindy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley c/n on site ok to cover ext walls ok to insulate int all but for areas were hold downs are not finashed
BLD-Footing4/24/20064/25/20064/25/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/24/2006 at 1:57:04 PM. Contact: ###-####. this was a foundation inspection
BLD-Foundation4/25/20064/25/20064/25/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/24/2006 at 1:57:04 PM. Contact: ###-####.
BLD-Footing4/20/20064/21/20064/21/2006APASS
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung