FIRE-Final Inspection | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 2/14/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
dana ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith C/C issued
|
DOC - Permit Finaled | 2/15/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | PASS |
Carol Montgomery
|
|
|
PASS
|
BLD-Framing/Rough-in | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Jim Sly
|
|
|
danna; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Conference | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | DONE |
Troy Cobbley
|
|
|
I went to the job site and went over the fire lane requirements with the contractors of both buildings. It appears the two separate parking lots are not connected as they were shown on the approved plans. I refered them to Scott. I was contacted by Scott later in the day and he stated that after meeting them and going over the plans that the way the parking lots are installed will be satifactory for fire department access.
|
BLD-Framing/Rough-in | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Jim Sly
|
|
|
dana - sheer insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Shear OK
|
BLD-Foundation | 6/8/2006 | 6/12/2006 | 6/12/2006 | A | PASS |
Jim Sly
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Jim Sly
|
|
|
jed ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 2500 psi design
|
BLD-Conference | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | NR |
Jim Sly
|
|
|
Phone #: ###-####
|