Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD06-00169
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10588 W BUSINESSPARK LN
Project NameSouthwind Business Park-Bldg E
Customer Number 
ePlanReviewNo
Description
Southwind Business Park - Building #E - To construct a new 1880 square foot, one story, wood framed office shell building and related site improvements. This is a shell permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building shares a zero lot line with office building #F. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20071/25/20071/25/2007APASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled1/25/20071/25/20071/25/2007PPASS
DetailsMike Jordan
UL approved 1 hr attic access installed. Letter of compliance issued for shell and core. Bonded for landscape and public works.
BLD-Final12/27/200612/28/200612/28/2006APART
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok for temp occ on shell. Needs to install 1hr rated UL listed attic access.
BLD-Final12/26/200612/27/200612/27/2006PFAIL
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Radiation damper required at fresh air duct at penetration at 1hr ceiling assembly. Provide UL listed 1hr attic access. Remove sheet metal patch at 1hr ceiling assembly . Must attach back to framing member.
FIRE-Final Inspection12/26/200612/27/200612/27/2006APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection12/22/200612/26/200612/26/2006APASS
DetailsForrest France
Items on previous c/n are complete, shell life safety is acceptable.
FIRE-Final Inspection12/22/200612/22/200612/22/2006PCANC
DetailsTroy Cobbley
Per Jeff he wants to reschedule for next week.
Code Occupancy Approval Temp  12/21/2006 DONE
I WILL SIGN TEMPORARY WHEN BOND POSTED FOR $79278.66
FIRE-Final Inspection12/12/200612/12/200612/12/2006PFAIL
DetailsTroy Cobbley
Provide pavement, provide fire lane signage per sheet A1-1a, provide sticker at the main exit, provide remote annunciator and test the duct smoke detector and provide the fire dept. review comments for other possible requirements.
BLD-Conference12/11/200612/12/200612/12/2006ADONE
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PNR
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PFAIL
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to box out elec panel box.
BLD-Framing/Rough-in10/27/200610/30/200610/30/2006ANR
DetailsMike Jordan
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to pull elec. permit for shell and get ri insp.
BLD-Aging Inspection10/4/200610/4/200610/4/2006 PASS
DetailsMike Jordan
wip
BLD-Framing/Rough-in7/19/20067/20/20067/20/2006PPART
DetailsMike Jordan
cameron sheer nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Roof nailing and hardware ok. Shear nailing on exterior perimeter walls ok. Simpson holddown straps were not installed. c/n posted. ok to cover roof.
BLD-Other7/5/20067/6/20067/6/2006APART
DetailsMike Jordan
MARK nOTE: SHEET WALL AND NAILING ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. 1hour seperation wall innner layer nailing pattern.
BLD-Footing6/5/20066/6/20066/6/2006APASS
DetailsMike Jordan
ed - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. peremeter footings. no special insp. is required.
BLD-Footing6/2/20066/5/20066/5/2006APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. perimeter footings. Cpntractor to confirm special insp.