Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00170
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10548 W BUSINESSPARK LN
Project NameSouthwind Business Park (Build
Customer Number 
ePlanReviewNo
Description
Southwind Business Park - Building #F (Shell Only) - To construct a new 1880 square foot, one story, wood framed office shell building and related site improvements. This is a shell permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building shares a zero lot line with office building #E. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/200910/19/200910/19/2009APASS
DetailsMike Jordan
cameron Phone #: ###-####
DOC - Permit Finaled10/19/200910/19/200910/19/2009PPASS
DetailsMike Jordan
Letter of compliance issued. Shell and core only. No slab on grade or other trades on interior work. Also noted on approved plans that remainder of 1hr. rated const. to be completed when TI work is to start. Still need rated const. at ceiling and for 10ft. on exterior wall from property line at tenant seperation. Elec. panel will be and issue.
FIRE-Final Inspection10/15/200910/16/200910/16/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Conference10/14/200910/14/200910/14/2009PPASS
DetailsMike Jordan
Spoke to cameron with Jayo const. Noted to him to get life/safety and bldg. finals for shell and core. all other trades and zoning have signed off. Cameron noted that he would get plans and get the life/safety and shell and core finaled so that permit can be closed out and not expired.
BLD-Final5/20/20085/21/20085/21/2008PNR
DetailsMike Jordan
Cameron; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs life/safety final.
Code Occupancy Approval3/10/20083/10/20083/10/2008PPASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Conference2/25/20082/25/20082/25/2008PPASS
DetailsMike Jordan
Called and spoke to Kameron Jayo, He noted that he would get all finals called in so that permit could be sighned off.
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PNR
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PFAIL
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. NOted elec. panel in 1 hr exterior wall, must be moved or boxed out.
BLD-Framing/Rough-in10/27/200610/30/200610/30/2006ANR
DetailsMike Jordan
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs elec. ri insp. Elec permit attached is for the tenant improvement and not the shell.
BLD-Wall cover7/20/20067/20/20067/20/2006PPART
DetailsMike Jordan
Noted that remainder of inspections were completed along with bldg F (bld06-00169) noted on posted c/n that contractor needs to call in both permits for insp. Roof nailing and hardware ok. Exterior shear wall nailing ok. Simpson holddown straps not installed. c/n posted. ok to cover roof.
BLD-Footing6/2/20066/5/20066/5/2006APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Permiter footings. Contractor to confirm special insp.