BLD-Conference | 10/28/2008 | 10/29/2008 | 11/4/2008 | A | PASS |
Dave Hannah
|
|
|
Barb-Dave could you please look at this and see if it can be finaled now that Fire passed? Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/14/2008 | 8/15/2008 | 8/18/2008 | A | PASS |
Forrest France
|
|
|
Okay for life safety final.
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | DEFR |
Forrest France
|
|
|
Barb----Dave this was given temp on 6-9-06 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-9-06. Please let me know...thanks Phone #: ###-#### sent to fire
|
FIRE-Final Inspection | 6/8/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been completed, inspection passed.
|
BLD-Final | 6/8/2006 | 6/9/2006 | 6/9/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/8/2006 at 9:47:32 PM. Contact: ###-####. ok for temp occ needs ada signage fixed and vill finish signed off
|
FIRE-Alarm Testing | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 6/7/2006 | 6/8/2006 | 6/9/2006 | A | NR |
Dave Hannah
|
|
|
JEAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | FAIL |
Forrest France
|
|
|
Project related fire sprinkler permit is not yet finaled, mechanical issues with respect to duct detectors are not resolved.
|
FIRE-Final Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | FAIL |
Forrest France
|
|
|
Some items on the previous correction notice have been completed, however the new duct smoke detectors installed at two locations are not connected to the building fire alarm system as required. This work will require a fire alarm permit to be issued prior to installation. Also need to provide proof of a current annual inspection by a qualified fire sprinkler contractor on the building sprinkler system.
|
BLD-Final | 6/2/2006 | 6/2/2006 | 6/2/2006 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2006 at 6:41:07 AM. Contact: ###-####.n/r
|
FIRE-Final Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | A | FAIL |
Forrest France
|
|
|
Missing required fire extinguisher, need to repair non-functional emergency light above the main entry, provide approved door hardware at the main entry/exit and the back door (remove manual thumbturns, door knob), provide signage above main entry/exit, provide means to test the two duct smoke detectors.
|
FIRE-Final Inspection | 5/31/2006 | 6/1/2006 | 6/2/2006 | P | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be requested for final inspection and approved prior to life safety final.
|
BLD-Final | 5/31/2006 | 6/1/2006 | 6/1/2006 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 2:48:56 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 3:45:45 PM. Contact: ###-####. ok to drop in ceiling panels
|
BLD-Other | 5/26/2006 | 5/30/2006 | 5/31/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 3:45:45 PM. Contact: ###-####.ceiling grid wires not 1 in 6
|
BLD-Framing/Rough-in | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PART |
Dave Hannah
|
|
|
jerry - ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles soffit ok received arch cals and detail for sofit
|
BLD-Framing/Rough-in | 5/1/2006 | 5/2/2006 | 5/2/2006 | A | PART |
Dave Hannah
|
|
|
Jerry; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Dave Hannah
|
|
|
jerry --call 1st for access ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie floor pents ok
|
BLD-Conference | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|