Permit Information
Permit NumberBLD06-00317
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 1600
Project NameUS BANK-16TH FLR
Customer Number 
ePlanReviewNo
Description
PER UNICO EXCEMPT BECAUSE THEY ARE THE PROPERTY OWNER OF US BANK PLAZA 3/7/06/MLS (QUANE SMITH)(US BANK-16TH FLR) To remodel a 9,519 sq.ft. office area located on the 16th floor per approved plans. Work to include, selective interior nonbearing demolition, construction of new noncombustible partitions to create individual office spaces, breakroom, small conference rooms, reception area, and open office areas, installation of a new suspended ceiling system related lighting, miscellaneous related interior finishes. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department.. Rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/8/20068/8/20068/8/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/8/2006 at 8:53:57 AM. Contact: ###-####.
FIRE-Final Inspection8/8/20068/8/20068/8/2006PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final8/7/20068/8/20068/8/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/7/2006 at 10:32:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 8 2006 7:28AM.
FIRE-Final Inspection8/7/20068/8/20068/8/2006ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 8/7/2006 at 10:31:37 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 8 2006 7:27AM.
BLD-Framing/Rough-in7/28/20067/28/20067/28/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/28/2006 at 7:12:10 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Final6/27/20066/28/20066/28/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/27/2006 at 2:48:05 PM. Contact: ###-####. ok to move into ph b
FIRE-Final Inspection6/27/20066/28/20066/28/2006PPART
DetailsForrest France
Partial inspection for phase 2 of the floor remodel is satisfactory.
BLD-Framing/Rough-in6/19/20066/20/20066/20/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/19/2006 at 8:51:09 AM. Contact: ###-####.
BLD-Framing/Rough-in6/7/20066/8/20066/8/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/7/2006 at 11:02:47 AM. Contact: ###-####. ok to cover walls
BLD-Final5/17/20065/18/20065/18/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/17/2006 at 2:16:59 PM. but ok to occ phase one
FIRE-Final Inspection5/17/20065/18/20065/18/2006APART
DetailsForrest France
Life safety inspection for the west half of the floor remodel is acceptable.
BLD-Framing/Rough-in5/1/20065/2/20065/2/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/1/2006 at 11:42:07 AM. Contact: ###-####. ceiling grid ok
BLD-Framing/Rough-in3/14/20063/14/20063/14/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/14/2006 at 8:33:32 AM. Contact: ###-####.