BLD-Final | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | PASS |
Dave Hannah
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
Permanent Occupancy | | 5/26/2006 | 5/26/2006 | | DONE |
|
|
|
|
BLD-Final | 5/5/2006 | 5/8/2006 | 5/8/2006 | P | PART |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for temp occ
|
FIRE-Final Inspection | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | PASS |
Forrest France
|
|
|
Corrections are completed, fire life safety passed inspection.
|
FIRE-Final Inspection | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide suite address as indicated on review notes, need to verify path of egress lighting is installed and functional within the TI space.
|
BLD-Final | 5/3/2006 | 5/4/2006 | 5/5/2006 | P | FAIL |
Dave Hannah
|
|
|
GREG; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades to final no inspection done
|
BLD-Framing/Rough-in | 4/28/2006 | 5/1/2006 | 5/1/2006 | A | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wall system ok
|
BLD-Energy code compliance | 4/28/2006 | 5/1/2006 | 5/1/2006 | A | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wall insulation ok
|