Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00351
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC9193
ePlanReviewNo
Description
Micron Building #80 - (C9193) - Build-out Area For Additional Metrology - To construct cleanroom walls and install new 8'-0" egress door at the corridor wall to create a new approximate 1685 square foot Metrology Area #109A in a previously unoccupied area. This work also includes related access floor and ceiling hepa filters. This work also inlcudes structural modifications to the second floor for new mechanical equipment and open the floor for a new return air chase. This work is being done at the first and second floors of building #80 between grid lines F&H and 3&5. All construction per the approved plans.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20071/16/20071/16/2007PPASS
DetailsJim Storey
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled1/16/20071/16/20071/16/2007PPASS
DetailsJim Storey
BLD-Aging Inspection1/5/20071/5/20071/5/2007 PASS
DetailsJim Storey
BLD-Aging Inspection11/2/200611/2/200611/2/2006 NR
DetailsJim Storey
pending fir final insp.
BLD-Aging Inspection9/1/20069/1/20069/1/2006 PASS
DetailsJim Storey
wip
FIRE-Final Inspection6/26/20066/27/20066/27/2006APART
DetailsForrest France
Fire life safety for the east cleanroom area passed inspection, project related FS work remains to be finaled.
BLD-Framing/Rough-in6/8/20066/12/20066/12/2006APASS
DetailsJim Storey
Greg Adams, Bldg. #80; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection4/25/20065/1/20065/1/2006ACANC
DetailsForrest France
craig pager #99710; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles per craig 4/25/2006