Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-00352
StatusFinaled
Name BOISE CITY BUILDING COMPANY
Site Address 211- 213 N FLUME ST
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE-527 BOISE CITY BUILDING COMPANY "DAVID HALE" To construct a 3140 sq. ft. duplex. (UNIT 1) 1583 sq. ft. with a 167 sq. ft. covered concrete entry porch, a 270 sq. ft. covered concrete patio at rear of structure and a 441 sq. ft. detached two car garage per approved plans, all engineering and attached condition list. (1st floor 864 sq. ft.)(2nd floor 714 sq. ft. (UNIT 2) 1557 sq. ft. with a covered entry way, a 255 sq. ft. covered concrete patio at rear of structure and a 441 sq. ft. detached garage per approved plans, all engineering and attached condition list. (1st floor 824 sq. ft.)(2nd floor 733 sq. ft.) THE CONSTRUCTION OF THE DWELLING UNIT SEPERATION WALL IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: Conversion permits and either a recorded subdivision or a zoning certificate and recorded record of survey must be completed prior to selling as individual units. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." R-2H ok per Sarah M Shafer per DRH05-00406. PC#051 DJO

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/3/200611/3/200611/3/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/3/2006 at 7:25:25 AM. Contact: ###-####.
DOC - Permit Finaled11/3/200611/3/200611/3/2006PPASS
DetailsDave Hannah
Code Occupancy Approval  11/2/2006 PASS
compliance met.
BLD-Final10/31/200610/31/200610/31/2006PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/31/2006 at 11:04:39 AM. Contact: ###-####. needs DRH signed off other items ok for final
BLD-Conference8/3/20068/3/20068/3/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/3/2006 at 7:04:41 AM. Contact: ###-####.
BLD-Energy code compliance7/31/20067/31/20067/31/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/31/2006 at 8:30:12 AM. Contact: ###-####.
BLD-Framing/Rough-in7/25/20067/25/20067/25/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/25/2006 at 9:08:40 AM. Contact: ###-####. c/n on site ok to insulate
BLD-Conference6/5/20066/6/20066/6/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/5/2006 at 3:28:13 PM. Contact: ###-####. truss firewall ok to set
BLD-Conference5/31/20065/31/20065/31/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/31/2006 at 7:40:04 AM. Contact: ###-####. second storey fire wall ok to stand
FIRE-Conference5/30/20065/31/20065/31/2006ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/30/2006 at 10:55:37 AM. Contact: ###-####.
FIRE-Conference5/30/20065/30/20065/30/2006PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/30/2006 at 7:01:05 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 30 2006 10:57AM.
FIRE-Conference5/24/20065/25/20065/25/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/24/2006 at 3:53:55 PM. Contact: ###-####. 1rts level fire wall ok to stand
BLD-Conference5/23/20065/24/20065/24/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/23/2006 at 2:19:04 PM. Contact: ###-####. fire walls
BLD-Conference5/19/20065/19/20065/19/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/19/2006 at 9:02:19 AM. Contact: ###-####.
BLD-Conference5/3/20065/4/20065/4/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2006 at 1:24:21 PM. Contact: ###-####. discussed fire wall
BLD-Foundation4/26/20064/27/20064/27/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/26/2006 at 10:26:00 PM. Contact: ###-####.
BLD-Footing4/25/20064/26/20064/26/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/25/2006 at 10:39:32 PM. Contact: ###-####.
BLD-Footing4/24/20064/25/20064/25/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/24/2006 at 5:44:34 PM. Contact: ###-####.