BLD-Final | 2/12/2007 | 2/13/2007 | 2/13/2007 | A | PASS |
Tony Young
|
|
|
Jonathan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
DOC - Permit Finaled | 2/13/2007 | 2/13/2007 | 2/13/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 2/13/2007 | 2/13/2007 | 2/13/2007 | | BOND |
|
|
|
The rough grading and drainage have been completed at the above mentioned address. However, final grading and the construction of a three foot high retaining wall beside the garage have not been completed. For this the engineer has recommended a bond of $2,000.00. Upon receipt of this bond the grading and drainage is conditionally approved
|
BLD-Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | NR |
Tony Young
|
|
|
jonathan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need hillside 1st
|
BLD-Energy code compliance | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | PASS |
Jim Sly
|
|
|
jim - note: shear nailing ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 10/4/2006 | 10/5/2006 | 10/5/2006 | A | FAIL |
Mike Jordan
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. No shear insp. done. Circular stairway tred depths do no conform to code. Complete lateral bracing. c/n posted. ok to insul.
|
BLD-Foundation | 7/19/2006 | 7/19/2006 | 7/19/2006 | P | PASS |
Jim Sly
|
|
|
clay; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | PART |
Tony Young
|
|
|
clay - pour around 11:30; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|