Permit Information
Permit NumberBLD06-00450
StatusFinaled
Name ROYAL PLAZA MASTER CONDO OA INC
Site Address 1112 W MAIN ST
Project NameROYAL PLAZA
Customer Number 
ePlanReviewNo
Description
(ROYAL PLAZA - SHELL) To build a new 97,585 square foot, seven story mix occupancy high rise shell and core building and related site improvements. This building is constructed of geopier and concrete foundation, steel structural frame and concrete floors. This building is fully fire sprinklered. The first floor will have retail, restaurant and parking (8 spaces) and building electrical and mechanical support areas. The second floor is parking (30 spaces). The third through sixth floor will be residential condominium units. The seventh floor will be individual residential storage units (26 units) an excercise room and a 1300 square foot roof top trellis covered terrace. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. Note: Grading/geopier permit issued under MIS06-00064. Partial foundation & stair towers issued under BLD06-01349. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/31/20185/31/20185/31/2018PPASS
DetailsBob Archibald
Chrisitna Phone #: ###-####. Affidavit of agreement, # 2###-####10, filed with Ada County. Ok to final.
BLD-Aging Inspection12/4/201512/4/201512/7/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection9/4/20159/4/20159/9/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection6/5/20156/5/20156/5/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection3/6/20153/6/20153/6/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection12/5/201412/5/201412/9/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection9/5/20149/5/20149/8/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection6/6/20146/6/20146/6/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection2/26/20142/26/20143/3/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection11/27/201311/27/201312/4/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection8/28/20138/28/20139/3/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection5/29/20135/29/20136/6/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection2/27/20132/27/20133/1/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection11/28/201211/28/201211/28/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection8/10/20128/10/20128/10/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection5/2/20125/2/20125/3/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection2/1/20122/1/20122/1/2012 DEFR
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection11/2/201111/2/201111/2/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection8/3/20118/3/20118/3/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection5/2/20115/2/20115/3/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection2/28/20112/28/20112/28/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection12/27/201012/27/20101/3/2011 PASS
DetailsDave Hannah
see history
BLD-Aging Inspection10/26/201010/26/201011/1/2010 PASS
DetailsDave Hannah
see history
BLD-Aging Inspection8/23/20108/23/20108/25/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection6/22/20106/22/20106/22/2010 DEFR
DetailsDave Hannah
this project is waiting for the opennings on the west wall to be closed up the 2hr fire rateing.
BLD-Aging Inspection4/21/20104/21/20104/21/2010 DEFR
DetailsDave Hannah
this project is waiting for the opennings on the west wall to be closed up the 2hr fire rateing.
FIRE-Final Inspection2/27/20082/28/20082/28/2008APASS
DetailsForrest France
Correction notice items verified for compliance, fire life safety finaled.
Code Occupancy Approval  2/23/2008 DONE
Revisions to the planter requirements at the entrance have been approved, per planner
BLD-Final2/15/20082/15/20082/15/2008PFAIL
DetailsForrest France
Pending repair of the air handler controls at the fire command center.
FIRE-Final Inspection2/13/20082/14/20082/15/2008AFAIL
DetailsForrest France
Controls for the air handling systems at the fire command center did not pass functionality testing.
BLD-Final12/7/200712/7/200712/11/2007PFAIL
DetailsDave Hannah
todd Phone #: ###-#### needs opennings in west wall filled in with two hour fire rated protection install exit sign in penthouse lobby finish front entry lobby finish room 302
FIRE-Final Inspection12/7/200712/7/200712/7/2007PPART
DetailsForrest France
Final pending completion and testing of items 4,5, and 12 per IFC 2003 section 509. Temp. Occ. approved for the shell and core per D. Hanneman.
FIRE-Final Inspection12/6/200712/6/200712/7/2007PFAIL
DetailsForrest France
Pending completion of items 4, 5,and 12 per IFC 2003 section 509 regarding the fire command center.
Code Occupancy Approval  12/7/2007 FAIL
Planter issue has not been resolved. Contractor wants to remove three from the front entrance way.
FIRE-Final Inspection12/4/200712/5/200712/5/2007PFAIL
DetailsForrest France
Missing some items as indicated per IFC 2003 section 509 regarding the fire command center, need to test stairway pressure fans on generator power, repair one exit discharge light and EM lighting at the stairway between the fire pump room and the generator, switch command center signage at doorways as discussed, need project related fire alarm permits finaled prior to life safety approvals.
BLD-Final12/5/200712/5/200712/5/2007PFAIL
DetailsDave Hannah
Todd; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt still needs other trades to signoff
FIRE-Final Inspection12/3/200712/4/200712/4/2007AFAIL
DetailsForrest France
Project is not in condition for a final fire life safety inspection, also need related fire alarm permit final.
FIRE-Final Inspection11/30/200712/3/200712/3/2007ANR
DetailsForrest France
Need project related fire alarm permit final.
BLD-Final11/26/200711/26/200711/27/2007PNR
DetailsDave Hannah
todd Phone #: ###-#### ok to cover corrador ceilings
BLD-Framing/Rough-in10/29/200710/30/200710/30/2007PPART
DetailsDave Hannah
justin Phone #: ###-#### ok to cover 2hr lid in exit passage way
BLD-Framing/Rough-in9/28/20079/28/20079/28/2007PPART
DetailsDave Hannah
Justin Phone #: ###-####
BLD-Framing/Rough-in9/14/20079/14/20079/17/2007PPART
DetailsDave Hannah
justin Note: level 2 overhead Phone #: ###-#### fire protection second floor ok
BLD-Framing/Rough-in8/16/20078/16/20078/16/2007PPART
DetailsDave Hannah
Jerry; Phone #: ###-#### Internet Inspection Request from: Hattie James hard lid framing parking area off alley ok to cover
BLD-Framing/Rough-in7/31/20077/31/20077/31/2007PNR
DetailsDave Hannah
JERRY Phone #: ###-####
BLD-Framing/Rough-in7/24/20077/25/20077/25/2007APART
DetailsDave Hannah
jerry Phone #: ###-#### sw corner fls 3-6 ext ok to cover
BLD-Framing/Rough-in6/25/20076/26/20076/26/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/25/2007 at 11:48:22 AM. Contact: ###-####.
BLD-Framing/Rough-in6/13/20076/13/20076/14/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/13/2007 at 8:45:26 AM. Contact: ###-####. northwall curtain wall fire stop 3rd fl ok shafts third fl ok section wall of by man elev thried and fourth fl ok to cover
BLD-Framing/Rough-in5/24/20075/24/20075/24/2007PPART
DetailsDave Hannah
julian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 3rd floor ok to cover partywalls and ext walls
BLD-Framing/Rough-in5/17/20075/18/20075/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/17/2007 at 9:01:52 AM. Contact: ###-####. third floor fire proffing at curtain wall
BLD-Framing/Rough-in5/15/20075/16/20075/16/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/15/2007 at 11:51:27 AM. Contact: ###-####. curyain wall fire proofing second and all but about 150ft of the north wall on the third floor ok to spray
BLD-Framing/Rough-in5/2/20075/2/20075/2/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/1/2007 at 2:28:01 PM. Contact: ###-####. curtain wall fire proofing ok
BLD-Framing/Rough-in5/1/20075/2/20075/2/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/1/2007 at 2:28:01 PM. Contact: ###-####. cutain wall fire stopping north wall fls 4,5&6 ok to spray
BLD-Framing/Rough-in4/27/20074/30/20074/30/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/27/2007 at 12:52:21 PM. Contact: ###-####. ext framing south east sides 2 and 3rd floor ok to sheet
BLD-Framing/Rough-in4/13/20074/13/20074/13/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/13/2007 at 7:23:21 AM. Contact: ###-####.
BLD-Framing/Rough-in4/4/20074/5/20074/5/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/4/2007 at 1:20:45 PM. Contact: ###-####.
BLD-Framing/Rough-in4/3/20074/3/20074/3/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/3/2007 at 9:02:14 AM. Contact: ###-####. sheet rook on stair towers ok to keep working
BLD-Framing/Rough-in3/30/20073/30/20073/30/2007PPART
DetailsDave Hannah
Randy; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover pent house
BLD-Framing/Rough-in3/26/20073/27/20073/27/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/26/2007 at 3:27:44 PM. Contact: ###-####. fire proofing 6th floor certain wall ok to spray
BLD-Framing/Rough-in3/23/20073/23/20073/23/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/23/2007 at 7:06:54 AM. Contact: ###-####.
BLD-Framing/Rough-in3/16/20073/19/20073/19/2007ACANC
DetailsDave Hannah
###-#### Julian
BLD-Framing/Rough-in3/19/20073/19/20073/19/2007PNR
DetailsDave Hannah
###-#### Julian 4th and 5th floor curtinwall fire proofing ok at floor but needs new detail for behind columns
BLD-Framing/Rough-in3/15/20073/16/20073/16/2007ACANC
DetailsJim Storey
julian or brad- pls first; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Inspector never came
BLD-Framing/Rough-in3/14/20073/14/20073/14/2007PPART
DetailsJim Storey
julin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 4th and 5 th floor curtin wall fire stop ok need to fireproof colms befor covering furout const.
BLD-Framing/Rough-in3/9/20073/12/20073/12/2007AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/9/2007 at 2:08:40 PM. Contact: ###-####.
C/N Install of mineral wool fire safe at floor lines sloppy and not per listing. C/N Installation of firestopping to include concealed areas at all corners of Bldg (flr line).
BLD-Framing/Rough-in3/9/20073/9/20073/9/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/9/2007 at 9:12:15 AM. Contact: ###-####. going over fire proffing
BLD-Framing/Rough-in3/7/20073/8/20073/8/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/7/2007 at 8:50:15 AM. Contact: ###-####. looking at fire damage
BLD-Framing/Rough-in2/23/20072/26/20072/26/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2007 at 3:09:16 PM. Contact: ###-####.pent house ok to cover ext walls
BLD-Framing/Rough-in2/12/20072/13/20072/13/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/12/2007 at 10:50:33 AM. Contact: ###-####. ext sheetrock 1hr wall ok to cover
BLD-Framing/Rough-in2/2/20072/5/20072/5/2007ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/2/2007 at 2:30:00 PM. Contact: ###-####.
BLD-Framing/Rough-in2/5/20072/5/20072/5/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/2/2007 at 2:30:00 PM. Contact: ###-####. parapit ok to cover
BLD-Framing/Rough-in1/30/20071/31/20071/31/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/30/2007 at 3:03:07 PM. Contact: ###-####. ok to cover ext of penthouse
BLD-Framing/Rough-in1/18/20071/19/20071/22/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/18/2007 at 2:54:48 PM. Contact: ###-####. ok for pent house ok for east side and east half of north wall floors 3 to 6
BLD-Framing/Rough-in1/11/20071/11/20071/11/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/11/2007 at 8:05:28 AM. Contact: ###-####.ext sheeting main street side ok toi cover
BLD-Framing/Rough-in1/10/20071/10/20071/10/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/10/2007 at 6:25:41 AM. Contact: ###-####.ext sheeting still not getting screw pattern wright
BLD-Framing/Rough-in1/9/20071/9/20071/9/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/9/2007 at 7:15:42 AM. Contact: ###-####.parapet framing ok to cover east and east half of north wall
BLD-Framing/Rough-in1/4/20071/4/20071/5/2007PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/3/2007 at 4:12:03 PM. Contact: ###-####. needs to finish welds and add scerws to perapet
BLD-Framing/Rough-in1/3/20071/4/20071/4/2007ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/3/2007 at 4:12:03 PM. Contact: ###-####.
BLD-Framing/Rough-in12/26/200612/27/200612/27/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/26/2006 at 2:48:45 PM. Contact: ###-####. penthouse ext walls ok to cover need more detail framing and strapes
BLD-Framing/Rough-in12/12/200612/13/200612/13/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/12/2006 at 9:32:40 AM. Contact: ###-####.south walls 2nd and third floors ok to cover after welding has been oked by spec inspector
BLD-Framing/Rough-in12/5/200612/6/200612/7/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/5/2006 at 3:20:12 PM. Contact: ###-####.pent house and roof
BLD-Framing/Rough-in11/28/200611/28/200611/29/2006PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/27/2006 at 9:11:56 AM. Contact: ###-####.
BLD-Framing/Rough-in11/27/200611/28/200611/29/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/27/2006 at 9:11:56 AM. Contact: ###-####. pent house area work in progress
FIRE-Supply Line Cover9/7/20069/7/20069/11/2006PDEFR
DetailsForrest France
Project related fire sprinkler permit has not been issued at this time, discussed tank and UG fire supply line issues.
BLD-Conference8/15/20068/16/20068/16/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/15/2006 at 12:39:36 PM. Contact: ###-####. meet with randy the steel forman and eric with mti decussed inspection of steel