BLD-Conference | 10/23/2007 | 10/23/2007 | 10/23/2007 | A | DONE |
|
|
|
Temp. Occ. extended for an additional 90 days per Jennifer thru 1-29-08
|
BLD-Final | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | PART |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall temp occ ok
|
FIRE-Final Inspection | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | PASS |
Troy Cobbley
|
|
|
LIfe safety passed per Brian
|
FIRE-Alarm Testing | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm passed
|
FIRE-Final Inspection | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the alarm permits are finaled.
|
BLD-Final | 4/26/2007 | 4/27/2007 | 4/27/2007 | P | NR |
Tony Young
|
|
|
DAN; Phone #: ###-#### conf only,, need trades 1st
|
BLD-Final | 4/25/2007 | 4/25/2007 | 4/26/2007 | P | NR |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 4/25/2007 | 4/26/2007 | 4/26/2007 | P | CANC |
Tony Young
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | P | CANC |
Troy Cobbley
|
|
|
dan - fire life safety - late afternoon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Code Occupancy Approval Temp | 4/24/2007 | 4/24/2007 | 4/24/2007 | A | DONE |
Michael Garner
|
|
|
site inspection complete - officer found that the builder has completed the required amount of work for a temporary occupancy - e.g., benches are on site- but not yet emplaced; there is a bond for remaining landscaping - officer contractor, Dan, to telephone me for a final when the rest of the work is complete
|
BLD-Framing/Rough-in | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | PASS |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall pump room for 1 hr construction
|
BLD-Conference | 4/13/2007 | 4/13/2007 | 4/16/2007 | P | PART |
Tony Young
|
|
|
Dan,, ADA ?s; Phone #: ###-#### ADA side clear on door side pull to be 18",, will turn door around
|
BLD-Conference | 4/12/2007 | 4/12/2007 | 4/13/2007 | P | PART |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall need ADA issues of side door pull access,,
|
BLD-Other | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PART |
Tony Young
|
|
|
DAN - CEILING; Phone #: ###-#### Internet Inspection Request from: Victoria Beall wip,, ok,, conf. on ADA requirements
|
BLD-Conference | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PART |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall conf on site w/ 408,, need hand rails on stairs to public way that is out from exits,, will see B.O. about one other possible need area
|
BLD-Conference | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PART |
Tony Young
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus extensive conf. on job for final,, need to see plan review for clarification on ext stairs
|
BLD-Conference | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | NH |
Tony Young
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus will re-schedule
|
BLD-Framing/Rough-in | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PART |
Tony Young
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover east side and atrium area
|
BLD-Energy code compliance | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PART |
Jim Sly
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall OK to cover select walls......All walls S. of rotunda....Mech rm bathrooms Etc.
|
BLD-Framing/Rough-in | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | PART |
Tony Young
|
|
|
jessica; Phone #: ###-#### Internet Inspection Request from: Darla Downs brick ties ok
|
FIRE-Conference | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | DONE |
Troy Cobbley
|
|
|
Dan and I went over fire extinguisher locations
|
BLD-Other | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | PART |
Tony Young
|
|
|
dan- note: shear ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles plywood on rear ok to cover
|
BLD-Wall cover | 1/2/2007 | 1/3/2007 | 1/4/2007 | A | PART |
Tony Young
|
|
|
Dan, trash enclosure rebar inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt exterior plywood ok per RFI and attachment to steel studs ok per letter from structural engineer
|
BLD-Other | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | PART |
Tony Young
|
|
|
Dan, trash enclosure rebar inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt vert. rebar is in place for masonary
|
BLD - Request for Extension | 12/28/2006 | 12/28/2006 | 12/28/2006 | | PASS |
Tony Young
|
|
|
###-#### - jessica Note: not ready shooting for May!!!
|
BLD-Framing/Rough-in | 12/12/2006 | 12/13/2006 | 12/14/2006 | A | PART |
Tony Young
|
|
|
Dan,, roof steel; Phone #: ###-#### wip.. ok to keep going,, special inspection on the welding,, pending reports
|
BLD-Framing/Rough-in | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | CANC |
Tony Young
|
|
|
structural steel or roof deck inspection please/// ###-#### dan
|
BLD-Other | 8/3/2006 | 8/7/2006 | 8/7/2006 | A | PART |
Tony Young
|
|
|
dan - rebar insp for stem wall; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley pending s. i. report
|
BLD-Other | 8/2/2006 | 8/3/2006 | 8/3/2006 | A | PART |
Tony Young
|
|
|
dan - call prior to re-bar insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley met w/ s. i.,, ok pending report,, also asked Dan to call all insections in
|
BLD-Other | 7/20/2006 | 7/21/2006 | 7/21/2006 | P | PART |
Tony Young
|
|
|
re-bar inspection//Dan Jafek ###-#### exterior and interior pad ftgs,, pend, s. i. report
|
BLD-Footing | 7/14/2006 | 7/17/2006 | 7/17/2006 | P | NR |
Mike Jordan
|
|
|
dan - ###-#### Note: rebar. contractor to rewshedule for tommorrow afternoon.
|
Code Occupancy Approval | 4/23/2007 | 4/23/2007 | | P | |
|
|
|
dan - final; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|