Permit Information
Permit NumberBLD06-00475
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC8790
ePlanReviewNo
Description
Micron Building #24C - (C8790) - Remodel Fab 4A in Building 24C to raise the clean room ceiling from ten foot height to fourteen foot height to accommodate new tool sizes. This work includes structural modifications to the interstitial floor area, additional structural roof supports for relocation of scrubber ducts and mechanical equipment, trench and install approximately 100 lineal feet of 4'-6" and 8'-0" wide by 4'-0" foot deep reinforced concrete equipment trenches at the subfab. and the demo and reconstruction of fab clean walls, hepa filter ceilng grids and interior doors. There is also significant mechanical, electrical and process piping modifications associated with this remodel project. This work is being done in Building #24C between grid lines #18&25 and #D&F at an approximate 6,675 sq. ft. area of the subfab, a 10,280 sq. ft. area of the main floor fabrication area and 10,190 sq. ft. of the interstitial space. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/11/200610/16/200610/16/2006APASS
DetailsJim Storey
Final raise the ceiling permit. Meet Greg at cube in bld. 25. cell ###-####.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
DOC - Permit Finaled10/16/200610/16/200610/16/2006PPASS
DetailsJim Storey
BLD-Final9/22/20069/29/20069/29/2006APART
DetailsJim Storey
Final inspection for open the new Fab to production. RTC C8790. Meet at Greg's cube or behind bld. 24C.; Phone #: ###-#### Internet Inspection Request from: Greg sub fab fire stopping corect in aplacation of collor assemblies wip
FIRE-Final Inspection9/22/20069/28/20069/28/2006APASS
DetailsForrest France
Fire life safety passed field inspection.
BLD-Conference9/20/20069/26/20069/28/2006APART
DetailsJim Storey
final inspection for fire system and door holder closure, acoustical ceiling areas will be ready for inspection.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes all ok pending firestopping lower level.
BLD-Conference9/26/20069/27/20069/28/2006APASS
DetailsJim Storey
COMPLETE THE FIRE ALARM TEST AND DOOR CLOSURE BETWEEN BLD. 24D & C. CALL GREG FOR DETAILS OF FIRE INSPECTORS ARRIVAL FOR THE AM OF THE 27TH.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes smoke test for fire door assemblies in 3 hr wall septration ok/ opening protection per listing.
BLD-Conference9/21/20069/22/20069/22/2006PCANC
DetailsJim Storey
Door closure and hardware assembly inspection between building 24C & D. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Conference9/20/20069/20/20069/21/2006ACANC
DetailsJim Storey
inspect door closure between Fab4A and Fab4B. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Conference9/6/20069/11/20069/11/2006APASS
DetailsJim Storey
24C Subfab 3 hour fire wall approval to begin construction; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes reviewed fire stopping assembly and approved aplacation per listing for size of opening and penatrating idems.
BLD-Conference8/24/20068/28/20068/28/2006APASS
DetailsJim Storey
inspect 1 hour exit hallway at Fab level and discuss 3 hour fire wall at subfab level.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Conference8/21/20068/22/20068/22/2006ANR
DetailsJim Storey
Inspect 1 hour wall for ceiling install in the lower Fab level east rooms.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes need fire stopping.
BLD-Framing/Rough-in8/16/20068/16/20068/16/2006PPASS
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles3hr door instaltion ok
BLD-Conference7/31/20068/1/20068/1/2006APASS
DetailsJim Storey
Inspect fire door frame installation between B24C & D.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes need to check spacing of door anchors per listing.
BLD-Conference6/19/20066/21/20066/21/2006APART
DetailsJim Storey
Look at fire rated door requirements and installation planning between B24C & D at the Fab level. Look at various notable items as the project progresses.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes pending listing
BLD-Conference6/9/20066/12/20066/12/2006APART
DetailsJim Storey
Door details for installation between building 24D and 24C at the Fab level for Mike Reyes; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Footing6/6/20066/9/20066/9/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:28:14 PM. Contact: ###-####.
BLD-Footing6/6/20066/8/20066/8/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:27:46 PM. Contact: ###-####.wip
BLD-Footing6/6/20066/7/20066/7/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:27:18 PM. Contact: ###-####.
BLD-Footing5/31/20066/5/20066/5/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/31/2006 at 3:33:09 PM. Contact: ###-####.wip si
BLD-Footing5/31/20066/2/20066/5/2006PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/31/2006 at 3:32:23 PM. Contact: ###-####. out of time.
BLD-Other5/26/20065/30/20065/30/2006APASS
DetailsJim Storey
Inspect steel, welding, and ceiling support structure. Look at other general conditions related to structure and concrete. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes