FIRE-Final Inspection | 10/2/2007 | 10/2/2007 | 10/3/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK for Perm Occ.
|
Code Occupancy Approval | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Carol Montgomery
|
|
|
|
Code Occupancy Approval Temp | 9/5/2007 | 9/5/2007 | 9/5/2007 | A | FAIL |
Carol Montgomery
|
|
|
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
|
Code Occupancy Approval | 9/5/2007 | 9/4/2007 | 9/5/2007 | P | CANC |
Carol Montgomery
|
|
|
|
BLD-Final | 8/31/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Jim Sly
|
|
|
Final for A and B wings. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 8/31/2007 | 9/4/2007 | 8/31/2007 | A | CANC |
Jim Sly
|
|
|
Final in A and B wings! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
|
BLD-Energy code compliance | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect final attic insulation in A and B wings. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | PART |
Jim Sly
|
|
|
Please inspect kitchen T-bar ceiling (B-wing). Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Above ceiling OK.......Need to re-inspect penitrations thru 2hr CMU wall in Kitchen area.
|
BLD-Other | 8/9/2007 | 8/10/2007 | 8/10/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing T-bar ceiling. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 8/3/2007 | 8/7/2007 | 8/7/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect B-wing 1st floor T-bar ceiling. Thanks you. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st floor B-wing, sheetrock nailing in completed units. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing on 1st floor of B-wing. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing completed units sheetrock. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st and 2nd floor A-wing T-bar ceiling. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing insulation. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer lids nailing on 2nd floor B-wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect framing on all floors of B-wing - see Dale first. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect framing on all floors of B-wing - see Dale first. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PASS |
Jim Sly
|
|
|
2nd layer sheetrock nailing on 3rd floor B-wing. :) Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor B-wing 1st layer sheetrock nailing in completed units - early PM if possible. Thanks Jim. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor B-wing insulation. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | NR |
Jim Sly
|
|
|
Please inspect T-bar ceiling grid on all 3 floors of A-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Need to complete firestopping.
|
BLD-Wall cover | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing sheetrock nailing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing 1st layer of sheetrock. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing 1st layer sheetrock nailing. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect framing in B-wing kitchen. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect A-wing 3rd floor insulation. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor framing in A-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect nailing on 2nd floor of A-wing in completed units. Anytime today is fine. Thanks. Phone #: ###-####
|
BLD-Wall cover | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing in ceiling on 2nd floor of A-wing. Thanks. Phone #: ###-####
|
BLD-Wall cover | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in completed units on 1st floor of A-wing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PART |
Jim Sly
|
|
|
Please inspect B-wing elevator framing. Thanks. Phone #: ###-#### OK
|
BLD-Wall cover | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PART |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing on 1st floor of A-wing. Thanks. Phone #: ###-#### OK
|
BLD-Framing/Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect 2nd floor A-wing. Thanks. Phone #: ###-#### 2nd floor OK to insulate.
|
BLD-Framing/Rough-in | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | PART |
Jim Sly
|
|
|
Please inspect 1st and 2nd floor at A-wing. Thanks. Phone #: ###-#### 1st floor OK to cover
|
BLD-Framing/Rough-in | 3/16/2007 | 3/19/2007 | 3/19/2007 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing framing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | PART |
Jim Sly
|
|
|
Please inspect 2nd and 3rd flooring framing at A-wing. Phone #: ###-#### Partial......recall for insp.
|
BLD-Other | 3/14/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Sly
|
|
|
Please inspect all floors framing in A-wing. Phone #: ###-#### Part
|
BLD-Framing/Rough-in | 3/14/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Sly
|
|
|
Please inspect B-wing sheer. Phone #: ###-#### Part
|
BLD-Other | 3/13/2007 | 3/15/2007 | 3/14/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect all floors framing in A-wing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/12/2007 | 3/15/2007 | 3/14/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect B-wing sheer. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PART |
Jim Sly
|
|
|
Please inspect roof nailing at B-wing. Thanks. Phone #: ###-#### Roof OK
|
BLD-Framing/Rough-in | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jim Sly
|
|
|
Please inspect framing of A-wing elevator (will also need C-wing elevator inspected - I''ll request seperately through C-wing permit). Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing roof nailing (partial). Anytime AM or PM.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Roof nailing OK
|
BLD-Framing/Rough-in | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PASS |
Jim Sly
|
|
|
Please inspect partial A-wing shear nailing Friday AM sometime. Thanks :); Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending special insp (MTI) .
|
BLD-Framing/Rough-in | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | PART |
Jim Sly
|
|
|
Please inspect shear nailing on 1st floor of A-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Shear at A wing 1st floor OK....MTI special insp and approval.
|
BLD-Foundation | 10/17/2006 | 10/18/2006 | 10/18/2006 | A | PART |
Jim Sly
|
|
|
Please inspect B-wing rebar Wed. morning. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 10/3/2006 | 10/4/2006 | 10/4/2006 | A | PART |
Jim Sly
|
|
|
Please inspect elevator shaft in B-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pend MTI insp, tests and appr.
|
BLD-Footing | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PART |
Jim Sly
|
|
|
Please inspect column footings at A-wing this afternoon.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 9/25/2006 | 9/27/2006 | 9/27/2006 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing rebar in AM; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PART |
Jim Sly
|
|
|
Please inspect 2-hour party wall footings tomorrow AM. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp, tests and approvals.
|
BLD-Concrete | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Tony Young
|
|
|
Please inspect structural steel in A-wing elevator tomorrow morning. If at all possible, this afternoon would be best! Thank you.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart special inspector did this one,, ok pending report
|
BLD-Concrete | 9/8/2006 | 9/11/2006 | 9/11/2006 | A | PASS |
Jim Sly
|
|
|
Please inspection elevator structural steel around noon Monday if possible. Thanks; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 9/5/2006 | 9/6/2006 | 9/6/2006 | P | PART |
Jim Sly
|
|
|
Please inspect around 2:30 or 3:00 if possible. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Foot OK Pend special insp, tests and appr...
|