Bella Plaza Office Building (shell & core) - To build a new 87,750 square foot, six story office shell and core building and related site improvements. This building is constructed of a concrete foundation, steel structural frame, concrete on pan deck floors and metal roof deck. This building will contain primarily office occupancies with a 4,950 square foot bank drive-thru. This building is fully fire sprinklered. The sprinklers are used for height and story increase. This is a shell and core permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM **(PLAN MODIFICATION - 9/17/07)** To reconfigure the electrical room and the stair enclosure on the first floor. This was approved by George Slane and Jim Schmer as an alternate for providing two exits from the electrical room. Work to include, construction of a two hour partition and stair soffit detail. See plan sheets A2.1, A3.1, A5.1 & A9.5 Dated 9/06/07. RMH.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/1/20097/1/20097/1/2009APASS
DetailsDave Hannah
DOC - Permit Finaled7/1/20097/1/20097/1/2009PPASS
DetailsDave Hannah
BLD-Final12/11/200712/12/200712/12/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/11/2007 at 4:01:36 PM. Contact: ###-####.
BLD-Final8/22/20078/23/20078/24/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/22/2007 at 7:44:50 AM. Contact: ###-####. ADA signs at restroom in wrong location
BLD-Conference7/11/20077/11/20077/12/2007PCANC
DetailsDave Hannah
BLD-Final7/3/20077/5/20077/5/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/3/2007 at 12:07:37 PM. Contact: (208) OK FOR TEMP
FIRE-Final Inspection7/2/20077/3/20077/3/2007APASS
DetailsForrest France
Corrections verified, shell fire life safety inspection passed.
FIRE-Final Inspection6/27/20076/28/20076/28/2007PFAIL
DetailsForrest France
Missing exit signage at one location on each floor- see approved building plans, also discussed related life safety items.
BLD-Final6/20/20076/21/20076/25/2007PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/20/2007 at 12:33:10 PM. Contact: ###-####. walked project with contractor still needs fire life saftey final
Code Occupancy Approval  6/12/2007 DONE
BLD-Framing/Rough-in5/3/20075/4/20075/4/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2007 at 5:35:11 PM. Contact: ###-####. elev fronts and lobbys ok to cover
BLD-Framing/Rough-in4/27/20074/30/20075/1/2007PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/27/2007 at 11:03:17 AM. Contact: ###-####.
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/27/2007 at 11:03:17 AM. Contact: ###-####. ok to cover front of elev 2nd thru 6th floors
BLD-Framing/Rough-in4/17/20074/18/20074/18/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2007 at 1:04:15 PM. Contact: ###-####. second floor elev and stairtowers ok to cover third floor also ok
BLD-Framing/Rough-in3/28/20073/29/20073/29/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/28/2007 at 7:56:46 AM. Contact: ###-####. ok to cover beams around stairtowers and elev shaft 1-6
BLD-Framing/Rough-in3/20/20073/21/20073/21/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/20/2007 at 11:22:44 AM. Contact: ###-####. 2nd and 6th floor and stair towers and elev ok to cover ext
BLD-Framing/Rough-in3/14/20073/15/20073/15/2007PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/14/2007 at 11:28:59 AM. Contact: ###-####.
BLD-Framing/Rough-in3/5/20073/6/20073/6/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/5/2007 at 3:09:03 PM. Contact: ###-####.
BLD-Framing/Rough-in3/1/20073/2/20073/2/2007APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/1/2007 at 9:47:26 AM. Contact: ###-####.
2hr perimeter floor fire safing appears OK at 2, 3, 4, and 5th floors.
BLD-Final2/28/20072/28/20072/28/2007PPART
DetailsDave Hannah
evev shaft floors 1-5
BLD-Framing/Rough-in2/27/20072/27/20072/28/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/26/2007 at 2:32:18 PM. Contact: ###-####. elev shaft walls ok to cover outerlayer floors 1 thru 5
BLD-Framing/Rough-in2/26/20072/27/20072/28/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/26/2007 at 2:32:18 PM. Contact: ###-####.
BLD-Framing/Rough-in2/23/20072/26/20072/26/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2007 at 12:43:35 PM. Contact: ###-####.ok to cover restroom on floors 2thru4
BLD-Framing/Rough-in2/20/20072/21/20072/22/2007PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/20/2007 at 2:47:28 PM. Contact: ###-####.
BLD-Framing/Rough-in2/21/20072/22/20072/22/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/20/2007 at 2:47:28 PM. Contact: ###-####. ok to finish fire proofing curtain wall at floor lines ok to start sheet rocking stair tower two outer layers stair tower one ok need to remove fire coulk from around fire dampers and frame around them in walls
BLD-Framing/Rough-in2/16/20072/20/20072/20/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/16/2007 at 11:01:02 AM. Contact: ###-####.
BLD-Framing/Rough-in2/20/20072/20/20072/20/2007PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/16/2007 at 11:01:02 AM. Contact: ###-####. curtain wall fire proofing not installed right ok to start covering out side walls
BLD-Framing/Rough-in2/7/20072/8/20072/8/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/7/2007 at 3:18:58 PM. Contact: ###-####. stair tower framing and sheet rock also elev shafts
BLD-Framing/Rough-in1/31/20072/5/20072/5/2007ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/31/2007 at 8:19:44 AM. Contact: ###-####.
BLD-Framing/Rough-in2/5/20072/5/20072/5/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/31/2007 at 8:19:44 AM. Contact: ###-####. crew working on stair and elev shafts all looking go
BLD-Framing/Rough-in1/29/20071/30/20071/30/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/29/2007 at 1:09:11 PM. Contact: ###-####. ok to start rocking stair towers
BLD-Framing/Rough-in1/22/20071/24/20071/24/2007APASS
DetailsDave Hannah
justin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in1/18/20071/19/20071/22/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/18/2007 at 2:21:59 PM. Contact: ###-####.parapit ok
BLD-Framing/Rough-in1/16/20071/17/20071/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/16/2007 at 3:22:32 PM. Contact: ###-####. ext sheeting ok also parapit framing ok but needs to be reveiwed by arct
BLD-Framing/Rough-in1/12/20071/16/20071/16/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/12/2007 at 10:35:45 AM. Contact: ###-####.
BLD-Framing/Rough-in1/2/20071/3/20071/3/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/2/2007 at 3:59:32 PM. Contact: ###-####. ext curten wall framing 1st - 4th ok to cover
BLD-Framing/Rough-in12/21/200612/26/200612/27/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/21/2006 at 4:22:02 PM. Contact: ###-####. needs fix bracing and add screws
BLD-Framing/Rough-in12/7/200612/8/200612/11/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/7/2006 at 11:57:49 AM. Contact: ###-####.needs to fix framing on north face floors 1thru 3rd
BLD-Foundation8/9/20068/11/20068/11/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/9/2006 at 2:03:13 PM. Contact: ###-####.
BLD-Footing8/9/20068/11/20068/11/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/9/2006 at 2:02:29 PM. Contact: ###-####.
BLD-Foundation8/3/20068/7/20068/8/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/3/2006 at 1:26:28 PM. Contact: ###-####.
BLD-Foundation7/31/20068/1/20068/1/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/31/2006 at 10:44:31 AM. Contact: ###-####.
BLD-Footing7/26/20067/28/20067/28/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/26/2006 at 1:18:22 PM. Contact: ###-####.
BLD-Foundation7/24/20067/25/20067/26/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/24/2006 at 11:16:57 AM. Contact: ###-####.
BLD-Foundation7/19/20067/21/20067/24/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/19/2006 at 12:03:11 PM. Contact: ###-####.
BLD-Foundation7/19/20067/20/20067/20/2006ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/19/2006 at 12:02:30 PM. Contact: ###-####. Doundation was inspected by special inspector.
BLD-Foundation7/17/20067/18/20067/18/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2006 at 12:36:46 PM. Contact: ###-####.
BLD-Foundation7/11/20067/13/20067/13/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/11/2006 at 10:42:43 AM. Contact: ###-####.
BLD-Footing7/11/20067/12/20067/13/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/11/2006 at 10:43:33 AM. Contact: ###-####.
BLD-Footing7/7/20067/7/20067/7/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/5/2006 at 12:44:11 PM. Contact: ###-####.
BLD-Footing7/5/20067/7/20067/7/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/5/2006 at 12:44:11 PM. Contact: ###-####.ok to pour mti on site
BLD-Footing6/26/20066/27/20066/28/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/26/2006 at 3:59:04 PM. Contact: ###-####. mti on site talked with supper and spec inspector all going well
BLD-Footing6/22/20066/23/20066/27/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/22/2006 at 8:53:59 AM. Contact: ###-####.
BLD-Footing6/15/20066/19/20066/19/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/15/2006 at 12:06:00 PM. Contact: ###-####.pwis mti
BLD-Footing6/12/20066/14/20066/15/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/12/2006 at 2:24:50 PM. Contact: ###-####.