FIRE-Final Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Footing | 6/2/2006 | 6/5/2006 | 6/5/2006 | P | DEFR |
Mike Jordan
|
|
|
kevin Note: as close 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. work inspected by special insp.
|
BLD-Concrete | 6/1/2006 | 6/2/2006 | 6/2/2006 | P | DONE |
Mike Jordan
|
|
|
collumn insp///request 1pm//kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Placement completed when on site. rebar and conc. had special insp.
|
BLD-Footing | 5/26/2006 | 5/31/2006 | 5/31/2006 | P | PART |
Mike Jordan
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Column pad footings, north side of bldg. Needs to clean bottom of footings.
|
BLD-Footing | 5/26/2006 | 5/30/2006 | 5/30/2006 | P | PASS |
Mike Jordan
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Exterior column pad footings North side of bldg.
|
BLD-Footing | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | PART |
Mike Jordan
|
|
|
dwayne Note: pouring at 3:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Bottom of footings were compacted vand tested. requested scope of work letter from special insp.
|
BLD-Footing | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | NR |
Mike Jordan
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Called in for interior column pad footings. rebar was not yet in place. Contractor needs to get geo-tech engineer to verify 3000psf soil bearing pressure of in place material. Special insp. for concrete is also required.
|