Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00632
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 8109 W FRANKLIN RD
Project NameFRANKLIN TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
LAYTON CONST RCE #6233//(CABELA'S)(FRANKLIN TOWNE PLAZA) To construct a new exterior canopy on the exterior of an existing builidng, install exterior doors, any related site work per approved plans and DRH06-00057. No occupancy of interior tenant space allowed under this permit. A separate permit will be issued for the tenant improvement to the interior of space. This building is fully fire sprinklered for allowed area. All alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. SEE ATTACHED LIST FOR SPECIAL INSPECTION REQUIREMENTS (RMH)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/21/20068/21/20068/21/2006PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Footing6/2/20066/5/20066/5/2006PDEFR
DetailsMike Jordan
kevin Note: as close 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. work inspected by special insp.
BLD-Concrete6/1/20066/2/20066/2/2006PDONE
DetailsMike Jordan
collumn insp///request 1pm//kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Placement completed when on site. rebar and conc. had special insp.
BLD-Footing5/26/20065/31/20065/31/2006PPART
DetailsMike Jordan
dwayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Column pad footings, north side of bldg. Needs to clean bottom of footings.
BLD-Footing5/26/20065/30/20065/30/2006PPASS
DetailsMike Jordan
dwayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Exterior column pad footings North side of bldg.
BLD-Footing5/23/20065/24/20065/24/2006APART
DetailsMike Jordan
dwayne Note: pouring at 3:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Bottom of footings were compacted vand tested. requested scope of work letter from special insp.
BLD-Footing5/19/20065/19/20065/19/2006PNR
DetailsMike Jordan
dwayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Called in for interior column pad footings. rebar was not yet in place. Contractor needs to get geo-tech engineer to verify 3000psf soil bearing pressure of in place material. Special insp. for concrete is also required.