BLD-Final | 1/5/2007 | 1/8/2007 | 1/8/2007 | A | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok fo perm occ
|
BLD-Final | 9/14/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ needs to flag locks on entry doors
|
FIRE-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PASS |
Forrest France
|
|
|
Items on previous c/n have been verified for completion, visual indicators at the main entry/exit doors to be installed prior to structural final.
|
FIRE-Final Inspection | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | FAIL |
Forrest France
|
|
|
Missing one exit sign as red lined on approved plans, fire extinguishers are not mounted, need to provide signage and flag lock indicator for the keyed locking main entry/exit doors.
|
BLD-Other | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | PART |
Dave Hannah
|
|
|
michael Note: grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ceiling grid
|
BLD-Wall cover | 7/31/2006 | 8/1/2006 | 8/1/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/31/2006 at 8:19:31 AM. Contact: ###-####.
|
BLD-Wall cover | 7/14/2006 | 7/18/2006 | 7/18/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 11:53:08 AM. Contact: ###-####.ok to cover wall and hard ceilings
|
Permanent Occupancy | | 1/8/2006 | 1/8/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/8/2006 | 1/8/2006 | | DONE |
|
|
|
|