Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-00658
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 7425 W SAXTON DR
Project NameSHADOW HILLS SQ RETAIL 7
Customer Number05279
ePlanReviewNo
Description
(Shadow Hills Square Retail Pod 7 - Shell Building) - To construct a new 2,900 square foot, one story, wood framed shell building and related site improvements. All construction per the approved plans. 10/30/06 This permit was modified to add a new 3068 door on the west side of the building and to add a new concrete sidewalk, retaining wall and guardrail along the building from the new west door to the existing south exterior door. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/200612/29/20061/2/2007PPASS
DetailsTony Young
shell and core final along with Tenant Improvement
guard rail is in place now
BLD-Final12/29/200612/29/200612/29/2006ANR
DetailsTony Young
public works guard rail,, verify
BLD-Final12/27/200612/27/200612/29/2006PNR
DetailsTony Young
need to verify the guard rail
BLD-Conference12/20/200612/27/200612/27/2006ACANC
DetailsTony Young
check on guard rail
BLD-Final12/19/200612/20/200612/20/2006APART
DetailsTony Young
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
just needs guard rail by rear side walk,, less than 30" drop off
BLD-Final12/5/200612/5/200612/5/2006PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/5/2006 at 6:29:01 AM. Contact: ###-####.
Need to do all work in body of permit. PW has signed off, but not finaled in computer.
FIRE-Final Inspection11/28/200611/28/200611/28/2006PPASS
DetailsTroy Cobbley
life safety finaled
Code Occupancy Approval11/28/200611/28/200611/28/2006PPASS
DetailsMichael Garner
site inspection complete - officer completed a review of approved conditions and found that compliance has been met - case closed
Code Occupancy Approval11/28/200611/28/200611/28/2006PPASS
DetailsMichael Garner
FIRE-Final Inspection11/16/200611/17/200611/17/2006PFAIL
DetailsTroy Cobbley
No city approved plans on site. No inspection performed.
BLD-Energy code compliance8/28/20068/29/20068/29/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/28/2006 at 1:13:15 PM. Contact: ###-####.
FIRE-Conference7/31/20068/1/20068/1/2006ADONE
DetailsForrest France
Confrence with GC to discuss building addressing (number size, location), core and shell life safety requirements, and fire lane marking.
BLD-Framing/Rough-in7/26/20067/26/20067/26/2006PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in7/25/20067/26/20067/26/2006ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/25/2006 at 11:26:32 AM. Contact: ###-####.
out of time,, rescheduled for pm
BLD-Foundation7/13/20067/14/20067/14/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/13/2006 at 9:24:59 AM. Contact: ###-####.
masonary on trash enclosure
BLD-Framing/Rough-in6/16/20066/19/20066/19/2006APART
DetailsTony Young
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
exterior ok to cover
BLD-Foundation5/12/20065/15/20065/15/2006APART
DetailsTony Young
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pending s. i. report,, also need ok on redi-rod for hold downs .vs. simpson hold down bolts
BLD-Footing5/9/20065/10/20065/10/2006APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ok pending s. i. report