Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00688
StatusFinaled
Name HANSEN-RICE INC
Site Address 3501 W ELDER ST
Project NameUNA MAS BLDG
Customer Number 
ePlanReviewNo
Description
(Hansen-Rice Inc. RCE-15057) Una Mas Office Shell & Core Building - To construct a 50,280 square foot, three story office building with a 17,420 square foot basement and related site improvements. This building is constructed of a concrete basement, steel structural frame with steel stud exterior walls, metal deck and concrete floors and metal roof deck. The basement contains 27 parking spaces, 14 varying sized storage units, restrooms with showers conference room, mechanical room and circulation hallway. The first floor finished core area includes central corridor/lobby, restrooms, phone/data room. This is a shell and core permit only. Separate tenant improvement permits are required to finish this building for occupancy. This building is fully fire sprinklered. The sprinklers are used for one-hour fire-resistive substitution. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20078/28/20078/29/2007APASS
DetailsJim Storey
John; Phone #: ###-#### Internet Inspection Request from: Hattie James
DOC - Permit Finaled8/29/20078/29/20078/29/2007PPASS
DetailsJim Storey
BLD-Conference8/10/20078/13/20078/13/2007APASS
DetailsJim Storey
John, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final8/3/20078/6/20078/6/2007APART
DetailsJim Storey
john Phone #: ###-#### temp ok/ c/n for ada shower threshold height. basement.
FIRE-Final Inspection8/2/20078/3/20078/3/2007APASS
DetailsForrest France
Shell and core fire life safety final inspection passed.
FIRE-Final Inspection8/1/20078/2/20078/2/2007PFAIL
DetailsForrest France
Still missing EM lighting at the east stairway.
FIRE-Final Inspection7/31/20078/1/20078/1/2007AFAIL
DetailsForrest France
Missing one exit sign on the first floor per approved plans, need to repair non-functional emergency lighting at the east stairway (all levels) and five lights on the first floor common corridor.
FIRE-Final Inspection7/30/20077/31/20077/31/2007ANR
DetailsForrest France
Still pending related FA and FS permit finals.
FIRE-Final Inspection7/27/20077/30/20077/30/2007ANR
DetailsForrest France
Still need fire alarm and sprinkler permit finals prior to life safety final.
FIRE-Final Inspection7/25/20077/26/20077/26/2007ANR
DetailsForrest France
Need project related fire alarm and fire sprinkler permits finaled before life safety final inspection and approval.
FIRE-Final Inspection7/20/20077/25/20077/25/2007ACANC
DetailsForrest France
No time available to complete inspection.
BLD-Framing/Rough-in7/10/20077/11/20077/11/2007APASS
DetailsJim Storey
jonathon - corn shell insp; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Conference7/5/20077/6/20077/6/2007ANR
DetailsJim Storey
john Phone #: ###-####
BLD-Conference7/3/20077/5/20077/6/2007ANR
DetailsJim Storey
john Phone #: ###-####
BLD-Conference6/29/20077/2/20077/2/2007ADONE
DetailsJim Sly
john; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Talked to Jon on phone.......We still need UL listing for rated shafts that have been compromised by demo, so we can determine the proper method of fix or repair.
BLD-Conference6/28/20076/29/20076/29/2007ACANC
DetailsJim Sly
tom Phone #: ###-####
Met with Jon (Hansen Rice)....He had questions as to what we want to look at, and when we want to look at it, in areas demo'd / re-installation of materials. Areas involve restroom ceilings, and rated HVAC shafts. Need UL listing for shaft (design) prior to next inspection.
Code Occupancy Approval6/8/20076/8/20076/8/2007PPASS
DetailsDena Gambrel
Code Occupancy Approval5/24/20075/24/20075/24/2007PFAIL
DetailsDena Gambrel
5-24-07 11:00 Met Rick on location. Fill in work on paving needs to be done. Crew on site working on it and he will call me when done.
BLD-Conference5/7/20075/8/20075/8/2007APASS
DetailsJim Storey
johnathan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Conference4/24/20074/25/20074/25/2007APASS
DetailsJim Storey
johnathon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/11/20074/12/20074/12/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/11/2007 at 8:04:41 AM. fire stopping east west stairs/ shaft protection/ firedamper access lables
BLD-Conference4/4/20074/5/20074/5/2007APASS
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall fireprooffing aplcation ok.
BLD-Framing/Rough-in3/27/20073/28/20073/28/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/27/2007 at 1:50:40 PM. Contact: ###-####.1 thur 3 2 hr stair encloser ok for cover.
BLD-Framing/Rough-in3/20/20073/21/20073/21/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/20/2007 at 1:17:52 PM. Contact: ###-####.2hr const. in progess to rate center stair encloser interior gyp and penatations complet.
BLD-Conference3/13/20073/14/20073/14/2007APASS
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall confrance on assemblies to rate stair 2hr/ what the floor fireprooffing 2 hr will be required.
BLD-Framing/Rough-in3/5/20073/6/20073/6/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2007 at 7:19:40 AM. Contact: ###-####.north and south canopys ok to cover.
BLD-Conference2/21/20072/22/20072/22/2007APART
DetailsJim Storey
rick - craig w/ lambaugh has been calling re same thing.; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in1/25/20071/26/20071/26/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/25/2007 at 4:50:33 PM. Contact: ###-####.
FIRE-Conference1/16/20071/17/20071/17/2007PDONE
DetailsForrest France
On site discussion regarding floor control valve manifold locations and accessibility requirements, also discussed duct detectors and bld fire code review notes.
FIRE-Conference1/9/20071/16/20071/16/2007PDEFR
DetailsForrest France
To be completed on 1/17 as agreed per telecon.
BLD-Framing/Rough-in12/27/200612/28/200612/28/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/27/2006 at 12:39:46 PM. Contact: ###-####. basement first floor ok
BLD-Other12/16/200612/18/200612/18/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2006 at 7:37:22 AM. fire proofing patched ok
BLD-Framing/Rough-in11/28/200611/29/200611/29/2006APART
DetailsJim Storey
jr; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles prep for fireproofing to maintane elavator rating of structral members in shaft/ si pending.
BLD-Framing/Rough-in10/18/200610/19/200610/20/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2006 at 4:48:51 PM. Contact: ###-####.
BLD-Concrete10/17/200610/19/200610/19/2006PPASS
DetailsJim Storey
j.r.; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Aging Inspection10/4/200610/4/200610/5/2006 PASS
DetailsJim Storey
wip
BLD-Foundation7/28/20068/1/20068/1/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/28/2006 at 3:30:15 PM. Contact: ###-####.placed with special insp.
BLD-Footing6/30/20067/3/20067/3/2006APART
DetailsJim Sly
jr; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Footing Pour.......Special inspector on site (MTI) Partial footings OK pend special insp tests and approvals.
BLD-Footing6/29/20066/30/20066/30/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/29/2006 at 10:09:39 AM. Contact: ###-####. needs spec inspection call strut engineer ok to pour after spec inspection sign off