BLD-Final | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2006 at 1:18:35 PM. Contact: ###-####.
|
DOC - Permit Finaled | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 5/12/2006 | 5/15/2006 | 5/16/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, related alarm work is complete, no sprinkler modifications required.
|
FIRE-Final Inspection | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | FAIL |
Forrest France
|
|
|
The project related fire alarm permit must be requested for field inspection and finaled prior to BLD permit life safety final inspection.
|
FIRE-Sprinkler Rough-in | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | CANC |
Troy Cobbley
|
|
|
Contractor wanted an inspector to walk the project and tell them if any sprinkler heads are overspaced. I told him that I could not do this and that he would need to contact a fire sprinkler contractor to verify sprinkler spacing prior to inspection
|
BLD-Framing/Rough-in | 4/21/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Dave Hannah
|
|
|
Please call first ###-#### Scheduled by a contractor via Hello! on 4/21/2006 at 7:23:04 AM. Contact: ###-####.
|