BLD-Final | 4/16/2008 | 4/17/2008 | 4/17/2008 | A | PASS |
Dave Hannah
|
|
|
Jack; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
FIRE-Final Inspection | 3/27/2008 | 3/27/2008 | 3/28/2008 | P | PASS |
Forrest France
|
|
|
Items on correction notice are complete, structrual inspector to verifiy adjusted door closures at apartment units are acceptable, fire life safety finaled.
|
BLD-Final | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 4:42:41 PM. Contact: ###-####. ok for temp
|
BLD-Final | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 9:04:20 AM. Contact: ###-####.
|
FIRE-Final Inspection | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | NR |
Forrest France
|
|
|
Lacking project related fire alarm and sprinkler permit finals, also need to provide or repair some items, see correction list on site.
|
Code Occupancy Approval | | | 3/17/2008 | | DONE |
|
|
|
Landscaping and other exterior work meets plan requirements. One outside step bar will be painted this pm
|
BLD-Conference | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/3/2008 at 3:50:36 PM. Contact: ###-####. ada unit
|
BLD-Final | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/25/2008 at 6:02:46 PM. Contact: ###-####. walked 2nd and 3rd floors
|
BLD-Other | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/5/2008 at 2:19:34 PM. Contact: ###-####. ok to cover ceiling in garage
|
BLD-Other | 1/25/2008 | 1/25/2008 | 1/25/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. ceiling grid in garage most of it ok needs to plump up some of the wires
|
BLD-Other | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. rescheduled to pm
|
BLD-Energy code compliance | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/6/2007 at 5:53:13 PM. Contact: ###-####. 5th floor ok to cover the rest
|
BLD-Energy code compliance | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2007 at 12:19:56 PM. Contact: ###-####. 5th floor ok to cover all but two units
|
BLD-Energy code compliance | 11/15/2007 | 11/15/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####. ok to cover 4th floor
|
BLD-Framing/Rough-in | 11/15/2007 | 11/15/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:55 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/12/2007 | 11/13/2007 | 11/13/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2007 at 5:30:08 PM. Contact: ###-####. ok to cover third floor
|
BLD-Framing/Rough-in | 11/12/2007 | 11/13/2007 | 11/13/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2007 at 5:29:41 PM. Contact: ###-####. ok to insulate fourth and fifth floors
|
BLD-Framing/Rough-in | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/7/2007 at 10:45:35 AM. Contact: ###-####. ok to insulate roof ceiling
|
BLD-Framing/Rough-in | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 5:50:06 PM. Contact: ###-####. ok to insulate third floor
|
BLD-Conference | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 5:49:40 PM. Contact: ###-####. draf stops in roof ceiling
|
BLD-Energy code compliance | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/1/2007 at 2:20:34 PM. Contact: ###-####. ok to cover second floor
|
BLD-Energy code compliance | 10/30/2007 | 10/31/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 4:03:13 PM. Contact: ###-####. first lfoor ok to cover
|
BLD-Framing/Rough-in | 10/30/2007 | 10/31/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 4:01:45 PM. Contact: ###-####.second floor ok to insulate
|
BLD-Framing/Rough-in | 10/24/2007 | 10/25/2007 | 10/25/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2007 at 5:28:28 PM. Contact: ###-####.first and second floor ok to insulate
|
BLD-Framing/Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:47 PM. Contact: ###-####.
|
BLD-Other | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:03 PM. Contact: ###-####. ok to cover ext
|
BLD-Other | 9/12/2007 | 9/12/2007 | 9/13/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:51 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/12/2007 | 9/12/2007 | 9/13/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:24 AM. Contact: ###-####.5th floor elev and stair and dumpter safts ok
|
BLD-Conference | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | DONE |
Dave Hannah
|
|
|
MEET DIXIE AT 9 AM
|
BLD-Other | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2007 at 8:27:07 AM. Contact: ###-####.forth floor stairtowers and elev shaft ok
|
BLD-Other | 8/23/2007 | 8/23/2007 | 8/24/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/23/2007 at 7:50:23 AM. Contact: ###-####. third floor sheetrock for stair towers and elev ok to cover
|
BLD-Other | 8/20/2007 | 8/21/2007 | 8/21/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/20/2007 at 4:49:43 PM. Contact: ###-####.
|
BLD-Other | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 4:01:22 PM. Contact: ###-####. ok to cover out side stair tower second floor
|
BLD-Other | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/10/2007 at 9:48:21 AM. Contact: ###-####. gyp nailling north and south stair and elavator nailling ok/ si signed off.
|
BLD-Conference | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | PASS |
Dave Hannah
|
|
|
jack - 8:30 Phone #: ###-####
|
Code Occupancy Approval | | | 7/19/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/16/2006 | 11/16/2006 | 11/20/2006 | | PASS |
Dave Hannah
|
|
|
wip
|