Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD06-00693
StatusFinaled
Name SACO CONSTRUCTION
Site Address 406 S 13TH ST
Project NameCityside Lofts-Phase II
Customer Number 
ePlanReviewNo
Description
Cityside Lofts Phase II of Plaza Mixed Used To construct a new 35 unit, 39,450 square feet, 5 story, wood framed, multi-family/condominium building, above a Type I-A parking garage, per City Ordinance 4-16. Each unit exceeds 800 square feet in floor area. Refer to BLD 05-02204 & BLD 05-02750 for the southern buildings and BLD 05-00926 for for the parking garage. NOTE: This building is fully fire sprinklered per NFPA 13 as required by Boise City Ordinance. All construction per the approved plans and attached comment list. MJP DRH 04-00241 CUP 04-00087. PLAN MODIFICATION * 5/3/07 * To relocate trash enclosure and add a trash chute to the exterior of the structure next to the north stair enclosure as shown on sheets A1.0, A2.1, A2.2, A2.3, A2.4, A2.5, A2.6, A5.0, A8.0, A8.1, A9.0, and A10.1 with revision dates after 4/1/07.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/16/20084/17/20084/17/2008APASS
DetailsDave Hannah
Jack; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
FIRE-Final Inspection3/27/20083/27/20083/28/2008PPASS
DetailsForrest France
Items on correction notice are complete, structrual inspector to verifiy adjusted door closures at apartment units are acceptable, fire life safety finaled.
BLD-Final3/27/20083/28/20083/28/2008APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/27/2008 at 4:42:41 PM. Contact: ###-####. ok for temp
BLD-Final3/19/20083/19/20083/19/2008PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/19/2008 at 9:04:20 AM. Contact: ###-####.
FIRE-Final Inspection3/19/20083/19/20083/19/2008PNR
DetailsForrest France
Lacking project related fire alarm and sprinkler permit finals, also need to provide or repair some items, see correction list on site.
Code Occupancy Approval  3/17/2008 DONE
Landscaping and other exterior work meets plan requirements. One outside step bar will be painted this pm
BLD-Conference3/3/20083/4/20083/4/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/3/2008 at 3:50:36 PM. Contact: ###-####. ada unit
BLD-Final2/25/20082/26/20082/26/2008ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/25/2008 at 6:02:46 PM. Contact: ###-####. walked 2nd and 3rd floors
BLD-Other2/5/20082/6/20082/6/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/5/2008 at 2:19:34 PM. Contact: ###-####. ok to cover ceiling in garage
BLD-Other1/25/20081/25/20081/25/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. ceiling grid in garage most of it ok needs to plump up some of the wires
BLD-Other1/24/20081/25/20081/25/2008ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. rescheduled to pm
BLD-Energy code compliance12/6/200712/7/200712/7/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/6/2007 at 5:53:13 PM. Contact: ###-####. 5th floor ok to cover the rest
BLD-Energy code compliance11/28/200711/29/200711/29/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/28/2007 at 12:19:56 PM. Contact: ###-####. 5th floor ok to cover all but two units
BLD-Energy code compliance11/15/200711/15/200711/16/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####. ok to cover 4th floor
BLD-Framing/Rough-in11/15/200711/15/200711/16/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
BLD-Energy code compliance11/14/200711/15/200711/15/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:55 PM. Contact: ###-####.
BLD-Framing/Rough-in11/14/200711/15/200711/15/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
BLD-Energy code compliance11/12/200711/13/200711/13/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/12/2007 at 5:30:08 PM. Contact: ###-####. ok to cover third floor
BLD-Framing/Rough-in11/12/200711/13/200711/13/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/12/2007 at 5:29:41 PM. Contact: ###-####. ok to insulate fourth and fifth floors
BLD-Framing/Rough-in11/7/200711/7/200711/7/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/7/2007 at 10:45:35 AM. Contact: ###-####. ok to insulate roof ceiling
BLD-Framing/Rough-in11/5/200711/6/200711/6/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/5/2007 at 5:50:06 PM. Contact: ###-####. ok to insulate third floor
BLD-Conference11/5/200711/6/200711/6/2007ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/5/2007 at 5:49:40 PM. Contact: ###-####. draf stops in roof ceiling
BLD-Energy code compliance11/1/200711/2/200711/2/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/1/2007 at 2:20:34 PM. Contact: ###-####. ok to cover second floor
BLD-Energy code compliance10/30/200710/31/200711/2/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/30/2007 at 4:03:13 PM. Contact: ###-####. first lfoor ok to cover
BLD-Framing/Rough-in10/30/200710/31/200711/2/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/30/2007 at 4:01:45 PM. Contact: ###-####.second floor ok to insulate
BLD-Framing/Rough-in10/24/200710/25/200710/25/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/24/2007 at 5:28:28 PM. Contact: ###-####.first and second floor ok to insulate
BLD-Framing/Rough-in10/11/200710/12/200710/12/2007ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:47 PM. Contact: ###-####.
BLD-Other10/11/200710/12/200710/12/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:03 PM. Contact: ###-####. ok to cover ext
BLD-Other9/12/20079/12/20079/13/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:51 AM. Contact: ###-####.
BLD-Framing/Rough-in9/12/20079/12/20079/13/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:24 AM. Contact: ###-####.5th floor elev and stair and dumpter safts ok
BLD-Conference9/5/20079/6/20079/6/2007ADONE
DetailsDave Hannah
MEET DIXIE AT 9 AM
BLD-Other8/31/20078/31/20078/31/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/31/2007 at 8:27:07 AM. Contact: ###-####.forth floor stairtowers and elev shaft ok
BLD-Other8/23/20078/23/20078/24/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/23/2007 at 7:50:23 AM. Contact: ###-####. third floor sheetrock for stair towers and elev ok to cover
BLD-Other8/20/20078/21/20078/21/2007PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/20/2007 at 4:49:43 PM. Contact: ###-####.
BLD-Other8/13/20078/14/20078/14/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/13/2007 at 4:01:22 PM. Contact: ###-####. ok to cover out side stair tower second floor
BLD-Other8/10/20078/10/20078/10/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/10/2007 at 9:48:21 AM. Contact: ###-####. gyp nailling north and south stair and elavator nailling ok/ si signed off.
BLD-Conference7/25/20077/26/20077/26/2007APASS
DetailsDave Hannah
jack - 8:30 Phone #: ###-####
Code Occupancy Approval  7/19/2007 DONE
BLD-Aging Inspection11/16/200611/16/200611/20/2006 PASS
DetailsDave Hannah
wip