Permit Information
Permit NumberBLD06-00768
StatusFinaled
Name 4TH STORY RESTROOM & ELEV LOBBY
Site Address 101 S CAPITOL BLVD
Project NameUS BANK-4TH FLR
Customer Number 
ePlanReviewNo
Description
PER UNICO EXCEMPT BECAUSE THEY ARE THE PROPERTY OWNER OF US BANK PLAZA///4/25/06 BAS (US BANK PLAZA - 4TH STORY RESTROOM AND ELEVATOR LOBBY REMODEL) This building is fire sprinklered because it is a high-rise. To upgrade the 4th story core restrooms to be accessible to the disabled and to remodel the 4th story elevator lobby. Selective nonstructural demolition within the restrooms and the elevator lobby is also covered under this permit. The floor area of the entire 4th story is about 14,600 square feet. The "core" has a floor area of about 2,730 square feet (335 square feet for restrooms, 937 square feet for elevator lobby and corridor, 1,458 square feet for stairways/elevators/shafts/etc). Work is to include interior nonbearing walls, ceilings, relocated plumbing fixtures, and finishes. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 4th story are required to comply with the provisions of the 2000 IBC. Existing systems shall be upgraded where necessary, including the installation of quick-response fire sprinklers throughout the 4th story. If not already existing, fire-safing shall be installed at the perimeter of the 4th story between the floor and the spandrel glass. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/23/20104/23/20104/27/2010APASS
DetailsDave Hannah
DOC - Permit Finaled4/27/20104/27/20104/27/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection4/23/20104/23/20104/23/2010 DEFR
DetailsDave Hannah
BLD-Framing/Rough-in8/17/20068/17/20068/18/2006PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/17/2006 at 8:14:05 AM. Contact: ###-####.
BLD-Framing/Rough-in8/17/20068/18/20068/18/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/17/2006 at 8:14:05 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Framing/Rough-in6/20/20066/20/20066/20/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/20/2006 at 6:55:18 AM. Contact: ###-####.