BLD-Final | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PASS |
Tony Young
|
|
|
###-#### John King ok for c of o
|
BLD-Final | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | NR |
Jim Sly
|
|
|
John ###-#### Note: per mIke phillips holds not on this bldg Need to final .......PLM-06-00564 still on issued status and ELE06-01379 on Hold....prior to calling for Bld final....Notified Contr.
|
FIRE-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Forrest France
|
|
|
Final inspection for apt. 300, 301, 308, 309 is acceptable, fire extinguishers for these units are on site and are to be installed today as a condition of approval.
|
FIRE-Final Inspection | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Forrest France
|
|
|
Required corrections for unit 315 second floor have been verified for completion.
|
BLD-Final | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Dave Hannah
|
|
|
John King ###-####//for quad 304, 312 ok for temp occ ok for perm occ after all units completed units 312-315 ok for temp after fire signoff
|
BLD-Final | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | FAIL |
Tony Young
|
|
|
John; Phone #: ###-#### need handrails on stairs serving 2 units,, need to verify zoning compliance per plan
|
BLD-Final | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | CANC |
Tony Young
|
|
|
john - note: units 312-315 and 304-307 ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time
|
FIRE-Final Inspection | 10/18/2006 | 10/19/2006 | 10/19/2006 | A | PART |
Forrest France
|
|
|
Units 304 thru 307 and unit 312 are okay for life safety final, unit 315 second floor needs primary power supply functional for the smoke alarms-the detectors were functional on battery backup test.
|
FIRE-Final Inspection | 10/16/2006 | 10/16/2006 | 10/16/2006 | P | FAIL |
Troy Cobbley
|
|
|
No approved notes. I did note that the smoke alarms still had covers on them, a fire extinguisher on the second level was missing and the one provided on the first level was too high. Also the doors do not close and the smoke seals have not been installed.
|
BLD-Final | 10/11/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Patricia Smith unit 312-315 ok for temp occ after fire l/s sign off
|
BLD-Energy code compliance | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PART |
Tony Young
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs 300-301 ok to cover
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Tony Young
|
|
|
john - quad 300; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 300-301 ok to insulate pending trades
|
BLD-Energy code compliance | 7/26/2006 | 7/26/2006 | 7/26/2006 | P | PART |
Tony Young
|
|
|
john Note: quad 308; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles quad 308 ok to cover
|
BLD-Framing/Rough-in | 7/18/2006 | 7/18/2006 | 7/18/2006 | P | PART |
Tony Young
|
|
|
john - quad 308; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley quad 308 ok to insulate,, still working on a couple of things
|
BLD-Energy code compliance | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | PART |
Tom Arcoraci
|
|
|
john; Phone #: ###-####/richard ###-#### quad 304 Internet Inspection Request from: Barbara Buckley 304 ok for cover
|
BLD-Energy code compliance | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Tony Young
|
|
|
john - 1st quad; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Quad #312 ok to cover
|
BLD-Framing/Rough-in | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley quad #304 ok to insulate
|
BLD-Framing/Rough-in | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | CANC |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | FAIL |
Mike Jordan
|
|
|
John King; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. needs to add double layer 5/8" typex above sheet metal plenum in hall way, and drop supply line out of floor/ceiling assembly or install two layers of 5/8" type X in between floor joist.
|