Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-00830
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer Number9004
ePlanReviewNo
Description
Micron Building #27 - Health Services (Addition) - To demolish and remove the windows and door at the west exterior door and to demolish and remove the sidewalk at the west end of the building. To construct a 33'x52' (1,700 sq. ft.) one story addition at the west end of the existing 12,500 square foot, health services building. The new addition will contain a new conference room, break room, laboratory and office support areas. The addition will be constructed of concrete foundation and floor slab, masonry exterior walls, steel roof joists and metal roof deck. This permit also includes remodel of some of the existing building to convert Conference Room #102K to two Exam Rooms #102K & #102L, to convert Office #102M and Treatment #102N to Exam Rooms #102S & #102T, to convert Lab Area #102C to Exam Rooms #102W & #102X, construct Teat Area #102Y at existing Open Work Area #102D. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/3/200610/10/200610/10/2006APASS
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Permanent Occupancy 10/10/200610/10/2006 DONE
Details
FIRE-Final Inspection10/4/200610/9/200610/9/2006APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection10/3/200610/4/200610/4/2006PFAIL
DetailsTroy Cobbley
Need fire alarm permit finaled and one emergency light provided that was not installled as per the plans and one existing exit sign has a burnt out buld. These items are marked on the city approved plans.
FIRE-Final Inspection9/29/200610/3/200610/3/2006ADEFR
DetailsForrest France
rob Note: life safety; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection rescheduled per contractor
BLD-Final9/29/200610/4/200610/3/2006ADEFR
DetailsJim Storey
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection9/29/200610/3/200610/3/2006ADEFR
DetailsForrest France
Duplicate inspection request already called in.
FIRE-Final Inspection9/29/20069/29/20069/29/2006PCANC
DetailsForrest France
Not ready per conversation with contractor, inspection mistakenly scheduled.
BLD-Other9/27/20069/29/20069/29/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/27/2006 at 12:24:38 PM. Contact: ###-####.
BLD-Other9/27/20069/28/20069/28/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/27/2006 at 12:24:03 PM. Contact: ###-####.
BLD-Other9/11/20069/12/20069/12/2006APASS
DetailsJim Storey
ceiling grid; Phone #: ###-#### Internet Inspection Request from: Rob Puckett
BLD-Framing/Rough-in8/22/20068/22/20068/23/2006PPASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rob Puckett pending ele
BLD-Other8/8/20068/10/20068/10/2006APART
DetailsJim Storey
ceiling grid; Phone #: ###-#### Internet Inspection Request from: Rob Puckett ok pending others before cover.
BLD-Wall cover7/27/20068/1/20068/1/2006APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rob Puckett
BLD-Foundation7/6/20067/10/20067/10/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2006 at 10:58:07 AM. Contact: ###-####.pwsi
BLD-Foundation7/6/20067/7/20067/7/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2006 at 10:57:35 AM. Contact: ###-####.si reports corections achived and on track.
BLD-Energy code compliance7/7/20067/7/20067/7/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2006 at 10:57:35 AM. Contact: ###-####.
BLD-Footing7/6/20067/6/20067/6/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/6/2006 at 10:56:56 AM. Contact: ###-####.cmu grout placment placed with si pending reports.
BLD-Footing6/21/20066/23/20066/23/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/21/2006 at 10:42:05 AM. Contact: ###-####.
BLD-Footing6/21/20066/21/20066/21/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/21/2006 at 10:41:37 AM. Contact: ###-####.
BLD-Footing6/15/20066/19/20066/19/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/15/2006 at 3:20:37 PM. Contact: ###-####. placed w/si
BLD-Footing6/6/20066/9/20066/9/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:26:01 PM. Contact: ###-####.
BLD-Footing6/6/20066/8/20066/8/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:25:29 PM. Contact: ###-####.wip
BLD-Footing6/6/20066/7/20066/7/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2006 at 12:24:48 PM. Contact: ###-####.