Permit Information
Permit NumberBLD06-00842
StatusFinaled
Name PETRA INC
Site Address 3815 W RICKENBACKER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE1875-Petra)(JACKSON JET CENTER) Exterior and interior remodel for a new assembly waiting/lobby area and new office areas within a two story building of an executive terminal and hangar facility per approved plans and CZC06-00026. The first floor is 6,755 sq. ft. and the new constructed second floor will be 2,623 sq. ft. The total building area is 9,378 sq. ft. This remodel will reduce the adjacent hangar to the East to 3,804 sq. ft. This building is separated from adjacent buildings to the east and west sides with existing and new 2-hour rated fire walls. This building is supposed to be an existing one-hour rated building. If not, it will be upgraded to a one-hour building under this permit. (roof-ceiling, floor-ceiling, exterior walls, bearing walls, columns etc…) Work to include miscellaneous nonstructural and structural demolition work including removing the existing second floor and stairways entirely, new constructed second floor with new joists/beams/columns and new reinforced concrete footings, a new open stairway, a new one-hour rated stair enclosure, a new spiral stairway, new handrails and guards, three new exterior steel constructed canopies, some new exterior stucco work, some new exterior windows and doors, new entrance/exit vestibules with power operated horizontal sliding doors, a new 2-hour rated fire wall section, new interior walls, new interior doors and windows, new accessible restrooms, a new accessible shower, interior finish, new suspended ceiling work, new counters and casework, mechanical work including five new HVAC rooftop units and associated ducting, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. Special Inspections required for structural steel welding and for epoxy/adhesive anchors. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20071/25/20071/25/2007APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Cathy Chilesfinal ok
Permanent Occupancy 1/25/20071/25/2007 DONE
Details
Code Occupancy Approval1/24/20071/24/20071/24/2007APASS
DetailsDena Gambrel
1-24-07 Outside painting completed.
BLD-Final12/12/200612/13/200612/13/2006PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/12/2006 at 5:12:21 PM.
Code Occupancy Approval12/13/200612/13/200612/13/2006PFAIL
DetailsDena Gambrel
12-13-06 Failed. Outside painting not complete. They will get me a bid to finish the painting and then post a bond.
BLD-Final12/11/200612/12/200612/12/2006PCANC
DetailsJim Storey
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final11/16/200611/17/200611/17/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/2006 at 2:05:05 PM. Contact: ###-####.life saftey ok for temp occ.
FIRE-Final Inspection11/16/200611/17/200611/17/2006APASS
DetailsForrest France
Life safety is acceptable, temp. occupant load signs to be replaced with permanent ASAP per contractor, exit discharge lighting at exterior canopies to be completed when construction of the canopies is finished.
BLD-Other11/1/200611/2/200611/2/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/1/2006 at 5:52:34 PM. Ceiling grid ok. Needs to repair elec. penetrations on west 2hr. wall above grid.
BLD-Framing/Rough-in10/20/200610/23/200610/23/2006ANR
DetailsJim Storey
mike; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in10/13/200610/16/200610/16/2006APART
DetailsJim Storey
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles water heater ok per engineering/ strucralsteel must be removed for colum wrap and need conection details.
BLD-Framing/Rough-in10/2/200610/3/200610/3/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/2/2006 at 3:20:24 PM. Contact: ###-####.
BLD-Framing/Rough-in9/20/20069/21/20069/21/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/20/2006 at 4:04:11 PM. bolt 5 ply lvl/ soport 2 ply lvl/
BLD-Framing/Rough-in8/18/20068/21/20068/21/2006APASS
DetailsJim Storey
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceilling sys. ok to complet progression.
BLD-Footing7/24/20067/25/20067/25/2006APASS
DetailsTom Arcoraci
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in7/19/20067/20/20067/20/2006APART
DetailsMike Jordan
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Inspected new 2hr seperation wall, at east end seperating east hangar from lobby area. Also verified 5/8 on bottom of roof deck for a distance of 4ft at east hangar. Contracot to supply spec shhets for hilti firecaulking for penetrations. Also noted that existing wall seperating the west hangar area from the office area will need to be replaced, will not meet 2hr. wall seperation requirements. Also inspected ceiling framing for new 2hr. ceiling.