Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00845
StatusFinaled
Name CHRISTENSEN CORPORATION
Site Address 415 -419 S 8TH ST
Project NameO W SMITH/R GREY BLDG
Customer Number 
ePlanReviewNo
Description
O.W. Smith/R. Grey Building - To demolish a portion of an existing warehouse building and to construct a new 31,325 square foot, three story, residential condominium and retail sales building with a 3,310 square foot basement. The basement will contain retail storage area and individual residential storage units. The first floor is 10,770 square feet and contains an approximate 1,030 square foot, four stall parking area, an approximate 1,705 square foot future tenant space, two approximate 1,160 square foot residential condos an approximate 4,350 square foot future tenant space and an approximate 1,365 square foot residential common entry and circulation area. The second floor is 10,770 square feet and is planned for 9 residential condominium units. The third floor is 9,785 square feet and is planned for 8 residential condominium units. This building will be constructed of a steel structural frame, concrete floors and masonry and steel stud new and existing exterior walls. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this thing for occupancy. All construction per the approved plans and attached comment list. Party Wall Agreement on File with project documents. Party Wall Agreement recorded with ADA County on 6/21/06 - #106098716. 6/28/07 Plan Modification to construct two demising wall to reduce the size of the future commercial space and create two additional future residential condiminium spaces at the first floor. The modification was to also upgrade Hall #111 to a one-hour fire resistive corridor.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20095/21/20095/21/2009PPASS
DetailsDave Hannah
Marva- Phone #: ###-####
FIRE-Final Inspection5/20/20095/21/20095/21/2009APASS
DetailsForrest France
All corrections per the last site visit have been completed, fire life safety finaled.
FIRE-Final Inspection5/20/20095/20/20095/20/2009PCANC
DetailsTroy Cobbley
To be rescheduled due to being overbooked.
BLD-Final5/4/20095/5/20095/6/2009PNR
DetailsDave Hannah
Marva Phone #: ###-####
FIRE-Final Inspection5/4/20095/5/20095/5/2009PFAIL
DetailsForrest France
See correction items per on site visit including provide a current annual inspection for the existing sprinkler system, fire extinguisher at the elevator equipment room and parking area, signage at the gate to the basement, two covered sprinkler heads at the stairways, provide EM lighting at the basement and 1st floor west exit corridor, repair one exit sign at the basment next to the riser room.
FIRE-Conference5/4/20095/4/20095/4/2009PDONE
DetailsForrest France
Regarding final inspection scheduling.
DOC - Permit Expired  7/9/2008 DONE
DetailsTisha Gallop
Spoke with Tammy from McAlvain Construction; they are no longer doing this project and do not plan on continuing with this project. No other contractor has taken over. The project has stopped for financial reasons and there has been no activity out there past the expiration date.//7/8/08 LEG
BLD-Framing/Rough-in7/25/20077/25/20077/25/2007PPART
DetailsDave Hannah
###-#### - dennis ok to cover corridor cielings
BLD-Conference7/2/20077/3/20077/3/2007PCANC
DetailsDave Hannah
###-#### Dennis
FIRE-Conference7/2/20077/3/20077/3/2007ANR
DetailsForrest France
Need most recent plans for review.
BLD-Framing/Rough-in6/25/20076/25/20076/25/2007APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Conference6/14/20076/15/20076/15/2007APASS
DetailsDave Hannah
PLEASE CALL TO CONFIRM YOUR AVAILABLITY. WE HAVE SCEHDULED FORREST BUT DO NOT YET KNOW HIS AVAILABILITY. WE ARE READY WHEN YOU ARE. Phone #: ###-#### Internet Inspection Request from: Alex Monge
FIRE-Conference6/14/20076/15/20076/15/2007ADONE
DetailsForrest France
On site visit to discuss status of fire alarm and sprinkler permitted work and issues for building life safety final.
BLD-Framing/Rough-in5/3/20075/3/20075/3/2007PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shafts ok to cover 2nd and 3rd fl
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007PPART
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman walked project with deff trade forman and super looked at shafts 3hr wall and plumbing pent in floors
BLD-Framing/Rough-in4/30/20074/30/20074/30/2007PCANC
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in4/24/20074/25/20074/25/2007APART
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shafts fire dampers plumbing fire prot ect
BLD-Framing/Rough-in4/11/20074/12/20074/13/2007PCANC
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in4/12/20074/13/20074/13/2007APART
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus curtan wall fire stopping ok to keep going
BLD-Framing/Rough-in4/9/20074/10/20074/10/2007APART
DetailsDave Hannah
DENNIS; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in3/27/20073/28/20073/28/2007AFAIL
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs shafts for fireplace vents and duct work and fire safeing at curtain wall
BLD-Framing/Rough-in3/26/20073/26/20073/26/2007PPART
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus walkede project with contractors ext shear wall and fire wall north face pass
BLD-Framing/Rough-in3/19/20073/20/20073/20/2007ACANC
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in3/20/20073/20/20073/20/2007PPART
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus three hour walls and ceiling of elec room
BLD-Framing/Rough-in3/12/20073/13/20073/13/2007APART
DetailsJim Storey
Dennis; Phone #: ###-#### Internet Inspection Request from: Stacie Backus conf over floor assemblies.
BLD-Framing/Rough-in2/28/20073/1/20073/1/2007APART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to ext walls on east west and south sides
BLD-Framing/Rough-in2/22/20072/23/20072/23/2007ACANC
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in2/23/20072/23/20072/23/2007PPART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover parapit and roof
BLD-Framing/Rough-in2/16/20072/20/20072/20/2007ANR
DetailsJim Storey
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall called and cancled
BLD-Framing/Rough-in2/16/20072/16/20072/16/2007PFAIL
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs city app plans on site
BLD-Framing/Rough-in1/30/20071/31/20071/31/2007APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation1/12/20071/16/20071/16/2007APART
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Other12/21/200612/21/200612/21/2006PPART
DetailsDave Hannah
dennis - rebar inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Other11/14/200611/15/200611/15/2006APART
DetailsDave Hannah
dennis - note: rebar ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Footing8/28/20068/29/20068/29/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/28/2006 at 12:49:13 PM. Contact: ###-####.