FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Corrections are complete, fire life safety passed inspection.
|
BLD-Final | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 7:36:30 PM. Contact: ###-####. ok for c.c after other trades final
|
BLD-Final | 2/21/2007 | 2/22/2007 | 2/22/2007 | P | FAIL |
Dave Hannah
|
|
|
Please contact Greg Bolton prior to going out. Thank You Phone #: ###-#### need 90 min fire door in basement and lever door hardware in basement exit doors
|
BLD-Other | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PASS |
Forrest France
|
|
|
Shell and core life safety is satisfactory, inspection passed. Noted door hardware at three locations in the basement to be changed prior to tenant occupancy approval.
|
BLD-Framing/Rough-in | 12/1/2006 | 12/1/2006 | 12/4/2006 | P | PART |
Dave Hannah
|
|
|
Please contact Grge Bolton prior to going out. ###-####; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover rest rooms in basement
|
BLD-Framing/Rough-in | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson second floor
|
BLD-Other | 8/31/2006 | 9/1/2006 | 9/6/2006 | P | DONE |
Dave Hannah
|
|
|
This is for a Structural Final inspection. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Other | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide approved exiting hardware at two exterior doors from the common corridor on the first floor, restrooms on the 2nd floor and basement level are not completed as indicated on work scope, the elevator is not installed at this time, project related fire alarm permit must be finaled prior to BLD permit final approval pending completion of duct detection and elevator controls.
|
BLD-Other | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | FAIL |
Forrest France
|
|
|
Scope of work is not completed at this time including some restrooms, elevator and shaft, some fire alarm work, existing fire sprinkler system needs a current annual inspection, project is not ready for final life safety inspection.
|
BLD-Other | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Dave Hannah
|
|
|
This is for a ceiling inspection. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover
|
BLD-Other | 8/18/2006 | 8/21/2006 | 8/22/2006 | P | NR |
Dave Hannah
|
|
|
craig Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 8/14/2006 | 8/15/2006 | 8/15/2006 | A | PART |
Dave Hannah
|
|
|
###-#### greg elev shaft ok to cover
|
BLD-Framing/Rough-in | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PART |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover shafts on 1st floor
|
BLD-Framing/Rough-in | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | FAIL |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson fire dampers need openings around them on inside shaft wall sealed up
|
BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PART |
Dave Hannah
|
|
|
If you have any questions please call Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to keep working on shaft and corr on first floor
|
BLD-Framing/Rough-in | 6/28/2006 | 6/29/2006 | 6/29/2006 | P | PART |
Dave Hannah
|
|
|
Please call Greg Bolton with any questions. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to start onesiding main floor and working on shafts need to seal up floor penetrations
|
BLD-Footing | 6/26/2006 | 6/27/2006 | 6/28/2006 | A | PASS |
Dave Hannah
|
|
|
Please schedule for 11:30am. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson this was for the elev pit walls
|
BLD-Framing/Rough-in | 6/26/2006 | 6/27/2006 | 6/27/2006 | P | NR |
Tony Young
|
|
|
If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Footing | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | PASS |
Mike Jordan
|
|
|
They will be pouring at 11am. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson. elevator pit.
|
BLD-Framing/Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | PART |
Tony Young
|
|
|
If you have any questions please call Greg Bolton ###-####; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson still need revision from architect to change mechanical room /shaft assy to 2hr assembly for our records,,verified 3 layers of rock on west mech room,, will have to re-do door frame attachment per listing,, also verified ul listing #412 for 2 hr non-bearing wall in mech room.
|
BLD-Framing/Rough-in | 6/9/2006 | 6/12/2006 | 6/12/2006 | A | NR |
Tony Young
|
|
|
greg - call 1/2 hr prior to insp for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley conf on firewalls,, need listings,, I am in a loaner truck w/out all my info,, they are working on a revision to plans for a two hour shaft assembly
|