Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01044
StatusFinaled
Name K2 CONSTRUCTION
Site Address 939 W BOEING ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(OROWEAT BAKERIES)(RCE 1824-K2 CONSTRUCTION) To remodel an existing 46,147 sq.ft. warehouse/office building for new tenant with bakery which includes cooking, freezing and packaging of food products per approved plans. The entire first floor and a portion of the 2nd floor to be occupied totaling 39,731 sq.ft. The balance of 6,417 sq.ft. of 2nd floor to be sealed off and not used. No information provided for the detached building on east side of property and this permit does not address occupancy of that structure. Work to include, removal of interior nonbearing partitions, cut new overhead door into existing concrete wall per approved engineering, installation of new plumbing, installation of new kitchen equipment, related site work, miscellaneous related finishes. This building is Fully Fire sprinklered for unlimited area building any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/21/20075/21/20075/25/2007 PASS
DetailsJim Storey
final ok card on site.
DOC - Permit Finaled5/25/20075/25/20075/25/2007PPASS
DetailsJim Storey
final ok card on site.
BLD-Final2/12/20072/12/20072/12/2007PPASS
DetailsJim Storey
ty; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok card on site.
FIRE-Final Inspection2/8/20072/9/20072/9/2007APASS
DetailsTroy Cobbley
Life safety passed. The items on the last correction notice have been corrected.
BLD-Final1/30/20071/31/20071/31/2007PPART
DetailsJim Storey
TY; Phone #: ###-#### Internet Inspection Request from: Darla Downs temp ok.blk off wall to mech access office side.
FIRE-Final Inspection1/30/20071/31/20071/31/2007AFAIL
DetailsForrest France
Provide reliable means for maintaining a min. of 40deg. F temperature in the riser and FACP room required for these systems, keyed locking hardware at the main entry/exit must only be operable from the egress side.
BLD-Aging Inspection1/15/20071/15/20071/16/2007 NR
DetailsJim Storey
pending fire
FIRE-Conference11/14/200611/15/200611/16/2006ADONE
DetailsForrest France
On site confrence to discuss requirements for final approval of the project building permit with regard to fire alarm, fire sprinkler, and life safety issues, also discussed attatched fire code review notes.
BLD-Final11/2/200611/6/200611/6/2006PCANC
DetailsJim Storey
stacy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
FIRE-Final Inspection11/2/200611/6/200611/6/2006ACANC
DetailsForrest France
stacy--life safety fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
FIRE-Final Inspection11/2/200611/3/200611/3/2006ANR
DetailsForrest France
The alarm and sprinkler permits must be finaled prior to life safety final.
FIRE-Alarm Testing11/2/200611/3/200611/3/2006ACANC
DetailsForrest France
Duplicate inspection request.
BLD-Final11/1/200611/2/200611/2/2006ANR
DetailsMike Jordan
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Still needs finals from others.
BLD-Final10/30/200611/1/200611/1/2006PDEFR
DetailsJim Storey
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time
FIRE-Final Inspection10/30/200611/1/200611/1/2006ANR
DetailsForrest France
The project related fire sprinkler and fire alarm permits must be requested for inspection, approved and finaled prior to BLD life safety final.
BLD-Conference9/20/20069/20/20069/20/2006PPASS
DetailsJim Storey
jason ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Conference8/10/20068/10/20068/11/2006PDONE
DetailsForrest France
On site confrence with the electrical contractor to discuss exit signage and requirements for emergency lighting.
BLD-Framing/Rough-in8/7/20068/7/20068/7/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/7/2006 at 7:50:06 AM. Contact: ###-####.
BLD-Conference6/12/20066/13/20066/13/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/12/2006 at 4:18:25 PM. Contact: ###-####. resbmit to ron hill.
FIRE-Conference6/5/20066/7/20066/8/2006ADONE
DetailsForrest France
On site discussion regarding permitted work scope, fire code review notes, modifications which affect the sprinkler system will require a fire sprinkler permit.
BLD-Framing/Rough-in6/7/20066/8/20066/8/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/7/2006 at 2:35:12 PM. Contact: ###-####.c/n to resubmit 2hr wall above cmu to roof deck for complance of assembly/ provide mezane details for exiting and support.