BLD-Aging Inspection | 5/21/2007 | 5/21/2007 | 5/25/2007 | | PASS |
Jim Storey
|
|
|
final ok card on site.
|
DOC - Permit Finaled | 5/25/2007 | 5/25/2007 | 5/25/2007 | P | PASS |
Jim Storey
|
|
|
final ok card on site.
|
BLD-Final | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | PASS |
Jim Storey
|
|
|
ty; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok card on site.
|
FIRE-Final Inspection | 2/8/2007 | 2/9/2007 | 2/9/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The items on the last correction notice have been corrected.
|
BLD-Final | 1/30/2007 | 1/31/2007 | 1/31/2007 | P | PART |
Jim Storey
|
|
|
TY; Phone #: ###-#### Internet Inspection Request from: Darla Downs temp ok.blk off wall to mech access office side.
|
FIRE-Final Inspection | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | FAIL |
Forrest France
|
|
|
Provide reliable means for maintaining a min. of 40deg. F temperature in the riser and FACP room required for these systems, keyed locking hardware at the main entry/exit must only be operable from the egress side.
|
BLD-Aging Inspection | 1/15/2007 | 1/15/2007 | 1/16/2007 | | NR |
Jim Storey
|
|
|
pending fire
|
FIRE-Conference | 11/14/2006 | 11/15/2006 | 11/16/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss requirements for final approval of the project building permit with regard to fire alarm, fire sprinkler, and life safety issues, also discussed attatched fire code review notes.
|
BLD-Final | 11/2/2006 | 11/6/2006 | 11/6/2006 | P | CANC |
Jim Storey
|
|
|
stacy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
|
FIRE-Final Inspection | 11/2/2006 | 11/6/2006 | 11/6/2006 | A | CANC |
Forrest France
|
|
|
stacy--life safety fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
|
FIRE-Final Inspection | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | NR |
Forrest France
|
|
|
The alarm and sprinkler permits must be finaled prior to life safety final.
|
FIRE-Alarm Testing | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | NR |
Mike Jordan
|
|
|
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Still needs finals from others.
|
BLD-Final | 10/30/2006 | 11/1/2006 | 11/1/2006 | P | DEFR |
Jim Storey
|
|
|
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time
|
FIRE-Final Inspection | 10/30/2006 | 11/1/2006 | 11/1/2006 | A | NR |
Forrest France
|
|
|
The project related fire sprinkler and fire alarm permits must be requested for inspection, approved and finaled prior to BLD life safety final.
|
BLD-Conference | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | PASS |
Jim Storey
|
|
|
jason ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Conference | 8/10/2006 | 8/10/2006 | 8/11/2006 | P | DONE |
Forrest France
|
|
|
On site confrence with the electrical contractor to discuss exit signage and requirements for emergency lighting.
|
BLD-Framing/Rough-in | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/7/2006 at 7:50:06 AM. Contact: ###-####.
|
BLD-Conference | 6/12/2006 | 6/13/2006 | 6/13/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 4:18:25 PM. Contact: ###-####. resbmit to ron hill.
|
FIRE-Conference | 6/5/2006 | 6/7/2006 | 6/8/2006 | A | DONE |
Forrest France
|
|
|
On site discussion regarding permitted work scope, fire code review notes, modifications which affect the sprinkler system will require a fire sprinkler permit.
|
BLD-Framing/Rough-in | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 2:35:12 PM. Contact: ###-####.c/n to resubmit 2hr wall above cmu to roof deck for complance of assembly/ provide mezane details for exiting and support.
|