FIRE-Final Inspection | 10/2/2007 | 10/2/2007 | 10/3/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK for Perm Occ.
|
BLD-Conference | 9/7/2007 | 9/10/2007 | 9/10/2007 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart Walk thru.....1st Floor.......
|
BLD-Conference | 9/6/2007 | 9/7/2007 | 9/7/2007 | P | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Walk thru 2nd floor ....all bldgs.
|
FIRE-Conference | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
Code Occupancy Approval | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Carol Montgomery
|
|
|
Meets compliance with DRH05-00320/CUP05-00028 - PASS.
|
BLD-Conference | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | DONE |
Jim Sly
|
|
|
Consulation with Troy - I will call you when he shows up or you can coordinate with him directly. Thanks, Katy Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
Code Occupancy Approval Temp | 9/5/2007 | 9/5/2007 | 9/5/2007 | A | FAIL |
Carol Montgomery
|
|
|
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
|
BLD-Final | 8/31/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Jim Sly
|
|
|
Final for C wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 8/31/2007 | 9/4/2007 | 8/31/2007 | P | CANC |
Jim Sly
|
|
|
Final in C wing! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
|
BLD-Conference | 8/29/2007 | 8/29/2007 | 8/29/2007 | P | DONE |
Jim Sly
|
|
|
Final inspection questions - we can do this over the phone if that''s better for your schedule. Thanks, Katy. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect final attic insulation in C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect T-bar ceiling grid on 2nd floor of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PART |
Jim Sly
|
|
|
Please inspect T-bar ceiling grid on all 3 floors of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart 1st floor only....OK
|
BLD-Other | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | NR |
Jim Sly
|
|
|
Please inspect T-bar ceiling grid on all 3 floors of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Need to complete firestopping.
|
BLD-Conference | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | DONE |
Jim Sly
|
|
|
Please meet Superintendent for overall job consultation. Phone #: ###-####
|
BLD-Wall cover | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in completed units on 3rd floor of C-wing. Thanks. Phone #: ###-#### OK
|
BLD-Wall cover | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in completed units on 3rd floor of C-wing. Thanks Phone #: ###-####
|
BLD-Energy code compliance | 3/1/2007 | 3/2/2007 | 3/2/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect C-wing 3rd floor 1st layer sheetrock nailing - AM if possible. Thanks! Phone #: ###-####
|
BLD-Wall cover | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in C-wing (see John Coe). Thanks. Phone #: ###-####
|
BLD-Energy code compliance | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor insulation of C-wing. Thanks. Phone #: ###-####
|
BLD-Energy code compliance | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect C-wing insulation. Thanks. Phone #: ###-####
|
BLD-Energy code compliance | 2/19/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect C-wing 2nd floor insulation. AM or PM is fine. Thanks! Phone #: ###-####
|
BLD-Energy code compliance | 2/14/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect C-wing insulation. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect C-wing framing. Thanks. Phone #: ###-####
|
BLD-Energy code compliance | 2/12/2007 | 2/13/2007 | 2/13/2007 | A | PART |
Jim Sly
|
|
|
joe - - early am ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith 1st floor OK
|
BLD-Framing/Rough-in | 2/8/2007 | 2/9/2007 | 2/9/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing trusses. Thanks! Phone #: ###-####
|
BLD-Energy code compliance | 2/7/2007 | 2/9/2007 | 2/9/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing insulation. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/7/2007 | 2/8/2007 | 2/8/2007 | P | FAIL |
Jim Sly
|
|
|
Please inspect C-wing trusses. Thanks Phone #: ###-#### C/N on site
|
BLD-Framing/Rough-in | 2/5/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing framing. Phone #: ###-#### 3rd Floor
|
BLD-Framing/Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing framing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2007 | 2/5/2007 | 2/5/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing framing in PM. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PART |
Jim Sly
|
|
|
Please inspect C-wing framing in AM. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2007 | 2/2/2007 | 2/2/2007 | P | PART |
Jim Sly
|
|
|
Please inspect framing in C-wing. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | PART |
Jim Sly
|
|
|
Please inspect framing in C-wing. Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2007 | 1/31/2007 | 2/1/2007 | P | NR |
Jim Sly
|
|
|
Framing C-wing Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2007 | 1/31/2007 | 1/31/2007 | A | NR |
Jim Sly
|
|
|
Please inspect structural framing, 1st floor of C-wing. Thanks! Phone #: ###-####
|
BLD-Framing/Rough-in | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing elevator framing (also requested A-wing elevator inspection as well). Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2006 | 11/30/2006 | 11/30/2006 | A | PART |
Jim Sly
|
|
|
Please inspect roof nailing this morning. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Areas that I could inspect were OK.....(icy)
|
BLD-Framing/Rough-in | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | PART |
Jim Sly
|
|
|
Please inspect C-wing roof nails. Anytime today is fine. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Partial insp......Icy.
|
BLD-Framing/Rough-in | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PART |
Jim Sly
|
|
|
Please inspect structural framing of C-wing between 1:00 and 2:00 if possible. See Joe Lamke when here; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 10/20/2006 | 10/20/2006 | 10/20/2006 | P | PASS |
Tom Arcoraci
|
|
|
Please inspect shear walls for C-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart mti on site
|
BLD-Wall cover | 10/3/2006 | 10/3/2006 | 10/3/2006 | P | DONE |
Jim Sly
|
|
|
Please inspect partial drywall on 1st floor of C-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PART |
Jim Sly
|
|
|
Please inspect 2nd floor corridor walls in C-wing this afternoon.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK
|
BLD-Framing/Rough-in | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | CANC |
Jim Sly
|
|
|
Please inspect parial framed hallway at C-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 9/19/2006 | 9/20/2006 | 9/20/2006 | A | PART |
Jim Sly
|
|
|
Please inspect C-wing framed hallways in AM. Internet Inspection Request from: Dale Shuart C wing halls OK to pre rock partial ceiling.
|
BLD-Footing | 8/14/2006 | 8/15/2006 | 8/14/2006 | P | PART |
Jim Sly
|
|
|
Please inspect the interior footings underslab of the 2nd leg of the C-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 8/10/2006 | 8/10/2006 | 8/10/2006 | A | PART |
Jim Sly
|
|
|
Please inspect patio post footings as soon as possible today. Dale will call this morning.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Footings for columns at entrys OK pend appr's
|
BLD-Foundation | 8/4/2006 | 8/7/2006 | 8/7/2006 | P | PART |
Jim Sly
|
|
|
We need to inspect interior bearing footing rebar and the reabar "mat" for the slab. Late in the day would be good for us (3:30 or so ) if possable.; Phone #: ###-#### Rebar mat and thickened slab appears OK pending MTI special insp, tests and approvals.
Internet Inspection Request from: Dale Shuart
|
BLD-Foundation | 7/31/2006 | 8/1/2006 | 8/1/2006 | P | PART |
Jim Sly
|
|
|
We would like the rebar in the raised stem walls of Elevator "C" Inspected shortly after lunch, if possible. (would like to pour around 3:00pm).; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp tests and appr
|
BLD-Foundation | 7/28/2006 | 7/31/2006 | 7/31/2006 | A | PASS |
Mike Jordan
|
|
|
Please inspect "C" wing elevator floor and sidewalls.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PART |
Jim Sly
|
|
|
Please do a partial inspection on section "C"; Phone #: ###-#### Internet Inspection Request from: Dale Shuart MTI special inspector on site.......Section C ... footing and found wall mono pour OK pending special insp, tests and approvals.
|