Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01069
StatusFinaled
Name BONAVENTURE LLC
Site Address 5850 N FIVE MILE RD
Project NameBONAVENTURE PLACE
Customer Number 
ePlanReviewNo
Description
(Bonaventure Place Retirement Community) This building is fully sprinklered for allowable area increase & compliance with occupancy use group. To construct a 1-hour fire-resistive, three story, 69 unit (26 units > 800 sq. ft.), multi family residential facility, separated from adjacent 'A2' Dining/common use area by a 2-hour fire wall to allow review of this portion as a stand alone structure for area & construction type. All fire-resistive assemblies to be as called out on plans. DRH05-00320 CUP05-00028 drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection10/2/200710/2/200710/3/2007PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final10/2/200710/2/200710/2/2007PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK for Perm Occ.
BLD-Conference9/7/20079/10/20079/10/2007ADONE
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Walk thru.....1st Floor.......
BLD-Conference9/6/20079/7/20079/7/2007PDONE
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Dale
Walk thru 2nd floor ....all bldgs.
FIRE-Conference9/7/20079/7/20079/7/2007PCANC
DetailsTroy Cobbley
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Code Occupancy Approval9/7/20079/7/20079/7/2007APASS
DetailsCarol Montgomery
Meets compliance with DRH05-00320/CUP05-00028 - PASS.
BLD-Conference9/7/20079/7/20079/7/2007ACANC
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference9/5/20079/6/20079/6/2007ADONE
DetailsJim Sly
Consulation with Troy - I will call you when he shows up or you can coordinate with him directly. Thanks, Katy Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Code Occupancy Approval Temp9/5/20079/5/20079/5/2007AFAIL
DetailsCarol Montgomery
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
BLD-Final8/31/20079/4/20079/4/2007PNR
DetailsJim Sly
Final for C wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference8/31/20079/4/20078/31/2007PCANC
DetailsJim Sly
Final in C wing! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
BLD-Conference8/29/20078/29/20078/29/2007PDONE
DetailsJim Sly
Final inspection questions - we can do this over the phone if that''s better for your schedule. Thanks, Katy. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference8/24/20078/27/20078/27/2007APASS
DetailsJim Sly
Please inspect final attic insulation in C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Other6/13/20076/14/20076/14/2007APASS
DetailsJim Sly
Please inspect T-bar ceiling grid on 2nd floor of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference6/11/20076/11/20076/11/2007PPART
DetailsJim Sly
Please inspect T-bar ceiling grid on all 3 floors of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
1st floor only....OK
BLD-Other6/5/20076/6/20076/6/2007ANR
DetailsJim Sly
Please inspect T-bar ceiling grid on all 3 floors of C-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Need to complete firestopping.
BLD-Conference3/30/20074/2/20074/2/2007ADONE
DetailsJim Sly
Please meet Superintendent for overall job consultation. Phone #: ###-####
BLD-Wall cover3/12/20073/12/20073/12/2007PPASS
DetailsJim Sly
Please inspect sheetrock nailing in completed units on 3rd floor of C-wing. Thanks. Phone #: ###-####
OK
BLD-Wall cover3/8/20073/9/20073/9/2007APASS
DetailsJim Sly
Please inspect sheetrock nailing in completed units on 3rd floor of C-wing. Thanks Phone #: ###-####
BLD-Energy code compliance3/1/20073/2/20073/2/2007PPASS
DetailsJim Sly
Please inspect C-wing 3rd floor 1st layer sheetrock nailing - AM if possible. Thanks! Phone #: ###-####
BLD-Wall cover2/27/20072/27/20072/27/2007PPASS
DetailsJim Sly
Please inspect sheetrock nailing in C-wing (see John Coe). Thanks. Phone #: ###-####
BLD-Energy code compliance2/27/20072/27/20072/27/2007PPASS
DetailsJim Sly
Please inspect 3rd floor insulation of C-wing. Thanks. Phone #: ###-####
BLD-Energy code compliance2/21/20072/22/20072/22/2007APASS
DetailsJim Sly
Please inspect C-wing insulation. Thanks. Phone #: ###-####
BLD-Energy code compliance2/19/20072/20/20072/20/2007APASS
DetailsJim Sly
Please inspect C-wing 2nd floor insulation. AM or PM is fine. Thanks! Phone #: ###-####
BLD-Energy code compliance2/14/20072/15/20072/15/2007PPASS
DetailsJim Sly
Please inspect C-wing insulation. Thanks. Phone #: ###-####
BLD-Framing/Rough-in2/14/20072/15/20072/15/2007PPASS
DetailsJim Sly
Please inspect C-wing framing. Thanks. Phone #: ###-####
BLD-Energy code compliance2/12/20072/13/20072/13/2007APART
DetailsJim Sly
joe - - early am ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
1st floor OK
BLD-Framing/Rough-in2/8/20072/9/20072/9/2007PPART
DetailsJim Sly
Please inspect C-wing trusses. Thanks! Phone #: ###-####
BLD-Energy code compliance2/7/20072/9/20072/9/2007PPART
DetailsJim Sly
Please inspect C-wing insulation. Thanks. Phone #: ###-####
BLD-Framing/Rough-in2/7/20072/8/20072/8/2007PFAIL
DetailsJim Sly
Please inspect C-wing trusses. Thanks Phone #: ###-####
C/N on site
BLD-Framing/Rough-in2/5/20072/7/20072/7/2007PPART
DetailsJim Sly
Please inspect C-wing framing. Phone #: ###-####
3rd Floor
BLD-Framing/Rough-in2/5/20072/6/20072/6/2007PPART
DetailsJim Sly
Please inspect C-wing framing. Thanks. Phone #: ###-####
BLD-Framing/Rough-in2/2/20072/5/20072/5/2007PPART
DetailsJim Sly
Please inspect C-wing framing in PM. Phone #: ###-####
BLD-Framing/Rough-in2/2/20072/5/20072/5/2007APART
DetailsJim Sly
Please inspect C-wing framing in AM. Phone #: ###-####
BLD-Framing/Rough-in2/2/20072/2/20072/2/2007PPART
DetailsJim Sly
Please inspect framing in C-wing. Phone #: ###-####
BLD-Framing/Rough-in2/1/20072/1/20072/1/2007PPART
DetailsJim Sly
Please inspect framing in C-wing. Phone #: ###-####
BLD-Framing/Rough-in1/31/20071/31/20072/1/2007PNR
DetailsJim Sly
Framing C-wing Phone #: ###-####
BLD-Framing/Rough-in1/30/20071/31/20071/31/2007ANR
DetailsJim Sly
Please inspect structural framing, 1st floor of C-wing. Thanks! Phone #: ###-####
BLD-Framing/Rough-in1/23/20071/23/20071/23/2007PPART
DetailsJim Sly
Please inspect C-wing elevator framing (also requested A-wing elevator inspection as well). Thanks. Phone #: ###-####
BLD-Framing/Rough-in11/30/200611/30/200611/30/2006APART
DetailsJim Sly
Please inspect roof nailing this morning. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Areas that I could inspect were OK.....(icy)
BLD-Framing/Rough-in11/27/200611/27/200611/27/2006PPART
DetailsJim Sly
Please inspect C-wing roof nails. Anytime today is fine. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Partial insp......Icy.
BLD-Framing/Rough-in11/15/200611/15/200611/15/2006PPART
DetailsJim Sly
Please inspect structural framing of C-wing between 1:00 and 2:00 if possible. See Joe Lamke when here; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Energy code compliance10/20/200610/20/200610/20/2006PPASS
DetailsTom Arcoraci
Please inspect shear walls for C-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart mti on site
BLD-Wall cover10/3/200610/3/200610/3/2006PDONE
DetailsJim Sly
Please inspect partial drywall on 1st floor of C-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Framing/Rough-in10/2/200610/2/200610/2/2006PPART
DetailsJim Sly
Please inspect 2nd floor corridor walls in C-wing this afternoon.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK
BLD-Framing/Rough-in9/20/20069/20/20069/20/2006PCANC
DetailsJim Sly
Please inspect parial framed hallway at C-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Framing/Rough-in9/19/20069/20/20069/20/2006APART
DetailsJim Sly
Please inspect C-wing framed hallways in AM. Internet Inspection Request from: Dale Shuart
C wing halls OK to pre rock partial ceiling.
BLD-Footing8/14/20068/15/20068/14/2006PPART
DetailsJim Sly
Please inspect the interior footings underslab of the 2nd leg of the C-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Footing8/10/20068/10/20068/10/2006APART
DetailsJim Sly
Please inspect patio post footings as soon as possible today. Dale will call this morning.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Footings for columns at entrys OK pend appr's
BLD-Foundation8/4/20068/7/20068/7/2006PPART
DetailsJim Sly
We need to inspect interior bearing footing rebar and the reabar "mat" for the slab. Late in the day would be good for us (3:30 or so ) if possable.; Phone #: ###-####
Rebar mat and thickened slab appears OK pending MTI special insp, tests and approvals.

Internet Inspection Request from: Dale Shuart
BLD-Foundation7/31/20068/1/20068/1/2006PPART
DetailsJim Sly
We would like the rebar in the raised stem walls of Elevator "C" Inspected shortly after lunch, if possible. (would like to pour around 3:00pm).; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK pending MTI special insp tests and appr
BLD-Foundation7/28/20067/31/20067/31/2006APASS
DetailsMike Jordan
Please inspect "C" wing elevator floor and sidewalls.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Footing7/24/20067/25/20067/25/2006APART
DetailsJim Sly
Please do a partial inspection on section "C"; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
MTI special inspector on site.......Section C ... footing and found wall mono pour OK pending special insp, tests and approvals.