BLD-Final | 6/25/2007 | 6/26/2007 | 6/26/2007 | P | PASS |
Dave Hannah
|
|
|
keith Phone #: ###-#### ok for perm occ
|
Permanent Occupancy | | 6/26/2007 | 6/26/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/18/2007 | 6/18/2007 | 6/18/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | FAIL |
Troy Cobbley
|
|
|
Most of the emergency lights would not work when pushing the test buttons and all of the exit signs did not work. There were no review comments with the approved drawings. I need verification that the hvac units are under 2,000cfm. The contractor did not answer his phone. Are the outside exit discharge lights listed for outdoor use?
|
BLD-Energy code compliance | 2/28/2007 | 3/1/2007 | 3/1/2007 | A | PASS |
Dave Hannah
|
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover
|
BLD-Framing/Rough-in | 2/23/2007 | 2/23/2007 | 2/23/2007 | P | PASS |
Dave Hannah
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to insulate
|
BLD-Other | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PART |
Dave Hannah
|
|
|
keith - roof inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PART |
Dave Hannah
|
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shear ok to cover ext
|
BLD-Footing | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 3:15:15 PM. Contact: ###-####.
|
BLD-Footing | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 3:15:15 PM. Contact: ###-####. elev is to high ftg needs to be lowered
|